Laserfiche WebLink
•i <br /> k ' <br /> MASHPEE SCHOOL COMMITTEE -- REGULAR MEE TI1 - OCTOBER 13, 1999 PAGE <br /> Mrs. Cook mentioned that the Town's Comprehensive Plan calls fox- <br /> another elementary school in the near future. She suggested <br /> reminding the Board of,Selectmen via a letter regarding the above. <br /> 7.4 l ela edOpening and Early Closing Flier EBCE - Motion <br /> made by lir. Paxton, seconded by Mrs. Cook, to approve policy . <br /> C , "Delayed Opening and Early 'Closing" as printed. Mr. Fluery <br /> said that his position for canceling school will be consistent with <br /> past policies. Parents should use their discretion.is keeping heir <br /> child(ren) hone on inclement weather dans. <br /> 7.5 Facilities Report- lair. Cook reported that during the month <br /> of October 1999, a district-wide tour was made with the School <br /> Committee, Town Administrator and Board of Selectmen. The <br /> Finance Committee was invited but members were unable to <br /> attend. <br /> 'One of the topics of concern was the condition of the buildings and <br /> grounds. The following items will be prioritized and cost estimated <br /> for consideration by the Capital Improvement Committee: <br /> Coombs school: <br /> • Interior painting <br /> 0 Koller replacement <br /> ashnet Schools., <br /> • Replace dishwasher <br /> Repair walks and curbing <br /> • Replace flooring tiles <br /> 0 Repair/past exterior stucco <br /> • Restore tennis court surfaces <br /> High school: <br /> • winterize irrigation system <br /> • Apply faU turf fertilizer <br /> 0 Rooftop HVAC filters washed <br /> d <br /> Snow removal equipment serviced and-ready <br /> On a personnel mote, the custodial vacancy at the high school has <br /> been filled beginning October 15, 1999. <br /> uahnet River School Principal' Mrs. ] ole also asked to have the <br /> telephone wiring at that school included in the CIP. <br /> The proposed Capital Improvement Program Schedule was as <br /> follows: <br /> FY3 <br /> Dishwasher - $ o,000 <br /> Staining wood- high school $38,000 <br /> Iron in water - $117200 <br />