Laserfiche WebLink
401 Na Ellis Hiahwav (contine <br /> Walter noted that the approved and proposed Plan differ from what exists. In new plan,, back <br /> of building is extending Into the parking lot. Walter commented that we don't kno rr whether <br /> expansion goes Into parking, into walk-way, or where. <br /> 0 Tom Fudala said Dino has a problem because one architect doing plan 'and other architect <br /> working on expansion. <br /> Walter questioned lighting to be used. Steve Daley responded the unit can hold whatever <br /> lights are needed. <br /> Walter explained complication of egress locations under the new proposal. <br /> Comments <br /> Need existing/proposed site plan. <br /> Front elevation shoving the outline of the existing building and the proposed addition o It� <br /> Site Plan with this proposal on a Plan. Gate has to be revised—not vide enough. <br /> Now have setback issues to lot lire-2 abufting properties owned by same people. <br /> Building code issues to be dealt with following approval. <br /> Narrative to existing building code. <br /> Down the road would need to look at Fire Department access issues'. <br /> Need engineering and site plan. <br /> Need to shover parking on site plan. Needs additional parking for additional seating. <br /> Glen Harrington advised Dino has to close a portion of the restaurant to be able to do this <br /> expansion because It is Zone 2. He has to keep restaurant design flog septic-wise the same. <br /> Charlie noted there are occupant load requirement in the building code. <br /> Glen said plan should show ghat portion of the restaurant will be closed. Walter added the <br /> plan should shover what seating is here and how 24 seats are.being removed'. Glen said Board <br /> of Health looks at absolute seating. _ <br /> Catherine Laurent suggested it might be helpful if something Were sent to lino in writing. <br /> Joyce Mason said she could write a letter to Dino and she suggested that perhaps wilding/Fire <br /> could meet with Dino to explain what would be needed with the additional seating prier to his going to <br /> the Board of selectmen. Tom Fudala said the architect should be involved. <br /> Joyce proposed delaying Tannin Board review. she said it is in Dino's best interests to have pre <br /> i <br /> meeting to go over ghat is needed. Charlie suggested Dino should also bring his architect to the <br /> meeting. Glen Darrington commented that Dino had said he doesn't want to go down so far and then <br /> find out he can't do it, so he would appreciate knowing this information before going forward. <br /> Joyce stated we have an obligation to point out the issues we see at this point. Steve Daley said if <br /> . this were -property I would appreciate knowing what you folks have offered. <br /> Conclusion <br /> Motion: Joyce ll ason motioned t continue until Building Department r eeting with Dino Mitrokostas <br /> is held andro er plans are submitted; Scott Carline seconded this motion; and it was unanimously <br /> p p <br /> passed by Design Review and Plan Review Committee. <br /> 2 <br />