Laserfiche WebLink
rtor�=budding to '±��' di�id+� east�t <br /> 7. Appropriate methods for determining pre-construction and post-construction <br /> storm water runoff shall be employed which takes into consideration <br /> topography, soil types, land slope and cover, impervious surfaces and other <br /> pervious surfaces shallnclude calculations for tire: , -years <br /> �i�cic� l�� th ,� yap sir e �nt ith���o�rrto��ng flooctrn� o ��i� � cnt <br /> n� � e t� oc�na�n�ren areas o�th+a ��� �� cif s �irr�iwa�r in p ����yet��s <br /> pre canstfuton rcriolf from the sits for the.tt?� year 77, shag h+ <br /> xc�p�ed fir po§t�+�ontructfprE p�n�ttiarl <br /> ;,New storm water runoff generated from the project shall not be directed to <br /> existing storm drainage facilities without proper treatment to prevent additional <br /> nutrients from entering the ground water anclthpr#f�ulf� ing leeq �renets <br /> cif p� �gr�p � ���bocr <br /> gz �`est �it� shall be t�the location of all suh surfacce d�aige fa�pil�tl <br /> nr�rp" ttpget + 1 +�� irt �[ pt� t -" cud �tpr The bottom of all <br /> drainage systems shall be maintained at least 2' above maximum high ground <br /> water. Tott tags,shatlp harn_on tle tlefltt� re t <br /> This policy does not require expansion of the existing road layout to accommodate <br /> specific t r ter "Best Management Practices" (BMP) designs. This policy requires <br /> adaptations of BMPs to the existing road layout. <br /> Red type is suggestedaddition <br />