My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2011 DESIGN REVIEW COMMITTEE Minutes
>
12/20/2011 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:16:20 PM
Creation date
4/13/2018 2:40:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Commons (continued) <br /> Walter Yarosh asked whatever they come up with to let the Committee know. <br /> The e-mail from Rich Morgan with Building Department comments regarding this Mashpee Commons <br /> matter was read into the record. Copy of the e-mail is attached to the printed set of these minutes. <br /> Joel Clifford noted this would be subject to Chapter 34 review. Tom Feronti said once they get into <br /> the Plan they will do all that. He said riser for the building going to be eliminated and tap into existing <br /> riser at back of Ghelfi's. He said access already there for building 6 and building 10 riser. He noted <br /> fire connection on Steeple Street at front on the building. <br /> John Renz said they won't designate loading zones, but will have Fire Zones designated. Joel asked <br /> that they designate loading so deliveries don't use fire zones. <br /> Glen Harrington said when tenants go in the Board of Health will have comments regarding food, etc. <br /> but at this point no comment. <br /> 168 Industrial Drive <br /> Representative —Kevin Kirrane <br /> Applicant seeks to expand the uses permitted <br /> Attorney Kevin Kirrane addressed the Committee and said they are going to the Planning Board on <br /> January 4th. He said no exterior or interior changes to the site or building are being done; they are <br /> simply seeking to expand the uses permitted. Tom Fudala stated it would be a modification to a <br /> Special Permit. <br /> Mr. Kirrane said Unit 1 is used for storage and is existing; cosmetic storage/distribution is existing <br /> since about a year ago; flip-flops is in unit 4 and the gymnastic studio is being proposed. Cape Cod <br /> Rehab proposed for unit 6; that is presently a permitted use. Bob Nelson asked would Cape Cod <br /> Rehab be same as gymnasium. Response was "no", not same. Gymnasium is a training facility to <br /> teach gymnasts. It will be all apparatus. Kevin Kirrane said most hours for the Gymnasium will be <br /> after school...3:30 p.m. to 8 p.m.; also special trainings at the weekend. <br /> Walter Yarosh suggested they take a look at the new Fire Code and chart at the front. He said they <br /> can look at each use they want to put in there and see fire code separation requirement. Applicant <br /> said they put 2-hour separation throughout the building. Kevin Kirrane said auto repair probably not <br /> going in. <br /> Applicant said building is sprinkled. <br /> Joel Clifford said they need a letter certifying walls have 2-hour fire separation. Also need fire sprinler <br /> narrative for each unit. They said they do have engineer of record to take care of the whole system, <br /> including fire alarm system. <br /> Glen Harrington advised they need septic system to be looked at when new tenant(s) go in. Also <br /> Board of Health needs a letter from engineer that septic flow has capacity to handle their use. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.