My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/2001 SCHOOL COMMITTEE Minutes
>
4/4/2001 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 5:03:23 PM
Creation date
4/13/2018 3:01:00 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/04/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE SCHOOL COMMITTEE—REGULAR MEETING—APRIL 43 2001 PAGE <br /> . Annexal maintenance was performed for four hot <br /> water boilers. replaced faulty low water cut-off <br /> devices, relocates set back thermostat and rewired the <br /> boiler pumps to run at a lower temp during night set <br /> back. <br /> . Potholes on the entry road will be repaired as soon a <br /> pavement is available. <br /> uashnt School: <br /> 1. The HVAC rooftop unit project for the <br /> Superintendent's office was awarded to Multiternp <br /> Mechanical Corp. work is scheduled to commence <br /> in id-May. <br /> . In response to Mr. Tippo's concern regarding when <br /> the side playground usage would be ready, Mr. Cook <br /> will add hardener to the surface as soon as it dries so <br /> it should be ready at the beginning of April. <br /> . Dishwasher replacement is scheduled foe- the end of <br /> June when school gets out for the summer. <br /> High School: <br /> l. Tennis court repairs, due to wind damage,were <br /> scheduled. <br /> . A practice shot put area will be placed near the <br /> practice football field to avoid further damage to the <br /> stadium field end zone. <br /> . Mr. Cook is working with NSTAR on a rebate <br /> program to install variable ratio drives to the hot <br /> water feed pumps. The drives will regulate the <br /> pumps proportionately with the heating load saving <br /> energy. The payback for the installation is estimated <br /> at 4.5 years calculated on$1,925.00 annual savings. <br /> 4. Performed annual chiller maintenance. <br /> . Mr. Cook met with Mr. Brown to discuss graduation <br /> set-up. <br /> . Mr. Cook will be meeting with a representative from <br /> Abbey Water Treatment to finalize specifications and <br /> costs for a system to solve the sidewalk staining. <br /> Included will be costs to clean the rust stains on the <br /> sidewalks and building. <br /> System-wide: <br /> 1. The custodial supply bid opening was held on March <br /> 27tH in the Superintendent's office. <br /> 2. Mr. Cook and lir. Costa will attend a 16-hour <br /> asbestos training session. <br /> Concerns: <br /> 1. Additional spring sports and equipment to set up and <br /> maintain (added fourth baseball team and outfield <br /> fencing). <br /> 2. Long-term custodial absences. <br />
The URL can be used to link to this page
Your browser does not support the video tag.