Laserfiche WebLink
Avis suggested that Janet A. Dane,the Board Secretary, be <br /> involved in receiving the ernails and being the liaison to the Board. <br /> Other details on web site set up were also discussed. <br /> V, New Business. Dene Read presented costs relative to a proposed <br /> resident boat storage,which would be placed in the center of the <br /> landfill. Rene stated that the DPW provided the estimated costs for <br /> this project. The area is approximately 150' x 120'. The total is <br /> approximately Thirty Three Thousand Dollars ($33,000.00)and <br /> 00/100. This would include Two Thousand Dollars ($2,000.00) <br /> and 00 100 for permits;Wine Thousand dollars($9,000. and <br /> 00/100 for stone; Twenty-Two Thousand Dollars ($22,000.00) and <br /> 00/100 for fencing; It is projected that there would be enough <br /> room for forty boats. Rene stated that it would take <br /> approximately three years to recoup the original costs of the <br /> project. Chris Avis noted that this idea had been mentioned a few <br /> years ago by Perry Ellis,the Harbormaster. Liability costs,, <br /> lighting, and staffing were discussed by Bill Johnson to determine <br /> what the overhead costs would be. Rene Read discussed that the <br /> lighting, staffing, etc. would go out to bidders in order to reduce <br /> the Town's liability. The Town would be required to have a One <br /> Million Dollar rider. Rene also noted that the access to the storage <br /> would be limited no twenty four access). He stated that these <br /> boats would be in the yard for storage only, and would likely be <br /> shrink wrapped. He did not see a need for twenty four hour access. <br /> V1. Liaison Updates. Chuck Gasior stated that he would like to help <br /> m familiarizing each other with what is going on within the Town <br /> Goverment. Chuck presented the idea of a monthly liaison report <br /> each month. <br /> There was also a discussion 7 initiated by Chuck Gasior, breaking <br /> down the budget and approximating the per student and per SPED <br /> student cost. Seventeen Thousand Seven Hundred Sixty Six <br /> Dollars($17,766.00)and 00/100 was the approximate per student <br /> cost. dill Johnson noted the fixed variable aspect of the cost <br /> structure. The variable part takes a lot of care and attention. It <br /> was suggested that this would need to be re-visited in the fixture, <br /> Ken Patrick, Bob Gasior and Bill Johnson discussed the budget <br /> further. It was once again noted that the community needs to be <br /> more educated about per student costs, and also that there needs to <br /> e a definite structure and guideline when it comes to school <br /> budgeting. <br /> Chuck Gasior stated that in the school budget there was a <br /> replacement truck, and the DPW has offered to transfer one of their <br />