My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/1997 FIRE STATION BUILDING COMMITTEE Minutes
>
8/5/1997 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:10:31 PM
Creation date
4/27/2018 1:54:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/05/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> e <br /> ISgryicej <br /> The design firm chosen will be responsible for providing the following services <br /> including, but not limited t , preparation of all site plans, construction plans, <br /> specifications, cost estimates, bidding documents, assistance with the bid process, <br /> environmental review, construction consultation and supervision, and any other <br /> responsibilities associated with the design,construction and items outlined herein..- <br /> a. <br /> erein.:a. work with the wilding Connittee and the Fire Chief to review the feasibility <br /> study and progranuning data that has been assembled to date. <br /> b. Revise programming data as required to achieve the goal of creating functional <br /> Fire and Rescue space meeting the needs of the department at a good value to <br /> the residents and the employees of the Town of Mashpee. <br /> c. Develop a programming work product including a Witten program of rooms <br /> and activities,their short-term(current to 20 year) spatial and functional needs, <br /> the adjacency of uses and long terra 20-- year) expansion plans. Including <br /> feasibility plans for a future sub-station. <br /> i <br /> d. The Designer shall prepare and submit concept sketches of various design <br /> ideas,including relative budgets, to determine a workable le plan solution in terms <br /> of the programs and various funding options. - - <br /> . Complete a structural and systems analris of-all building systems, including <br /> structural, plumbing, elect cal, mechanical, communications and VAC <br /> systems and incorporate system upgrades into design documents. <br /> f. Perform an analysis of handicap access with accessibility improvements to be <br /> incorporated into the design program. <br /> g. Consult and Work with-the Building Committee to select design option. <br /> h. Fully develop a final design program for the selected design, including all <br /> detailed plans,drawings, specifications and construction bidding materials. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.