Laserfiche WebLink
Fire Station Building Committee <br /> Mnutes <br /> February 2 , 1999 <br /> Present: Joyce Mason, George Baler, Dr. Elizabeth Petti, <br /> Peter Thomas, George Weznlal <br /> Absent: Joseph Peltier <br /> Guests: Deputy Fire Chief- Sheldon Hamblin <br /> Firefighter-Michael B aul <br /> Project Architect- James May <br /> Meeting Called to Qr-da by Chairman Mason at 3,00 p.m. <br /> Ton Hall, Conference Room #1. <br /> MoWay. Ignuaa—I I. 1999: <br /> Motion made by Dr. Petti to approve the minutes of Monday, <br /> January 1 , 1999 as presented. <br /> Motion seconded by Mr. Baker: <br /> YOTED Unanimous. 5-0. <br /> P ` <br /> Jaynes May, Project Architect for Wallace,Floyd, Associates, Inc. <br /> presented initial design schematics of the Mashpee Fire &Rescue Station <br /> renovation restoration project to the Fire Station Building Committee for review. <br /> preliminary subcommittee meeting was held with the architect and <br /> several members of the fire department to review project priorities to <br /> develop several design scenarios to meet departmental needs and objectives. <br /> The site plan depicted additional Town owned property to the south side of <br /> the existing Fire&Rescue Station. Mr. May suggested the committee explore <br /> the possibility of encroaching onto the land reflected as lot# . The area i <br /> proposed as general use Town land. A funeral home is planned to be located to <br /> the left of the subject site location. It was noted that the existing firefighter <br /> living quarters are established on the north side of the present site location. <br />