My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/4/1999 FIRE STATION BUILDING COMMITTEE Minutes
>
3/4/1999 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:04:55 PM
Creation date
4/27/2018 2:09:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/04/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station.Building Committee <br /> minutes <br /> March 4, 1999 <br /> Present: Joyce Mason, George Baker,Dr. Elizabeth Petti, <br /> Peter Thomas, George Weznia , Joseph Peltier <br /> Guests: Deputy Fire Chief- Sheldon Hamblin <br /> Project Architects-Len Bertaux, James May <br /> Inspector of Buildings -William Hauck <br /> Meeting CaUd.to Q by Chairman Mason at 3:oo p.m. <br /> Town Hall, Conference Boon 4 I. <br /> W&dngaday.Febmaa24...1999= <br /> Motion made by Mr.Wezniak to approve the minutes o <br /> Wednesday,February 24, 1999 as presented. <br /> Motion seconded by Mr. Thomas. <br /> YDIE-.b Unanimous. 560, <br /> Mr. Peltier abstained. <br /> RUQRT--OF--TBE AR-CWIECL. <br /> Len Bertaux,Principal-in-Charge and.dames May,Project Architect <br /> of Wallace,Floyd, Associates presented conceptual design estimates <br /> for the Mas . ee Fire&Rescue Station project to members of the <br /> Fire Station Building Committee. <br /> Design schematics relative to the renovation of the existing station, and <br /> the construction of a new facility on the south side of the subject site <br /> location was discussed. <br /> It was noted that a fl I basement is incorporated into the design scheme <br /> of 2B.-new construction, in lieu of a}ire-engineered building. <br /> The construction scenarios were fully considered. The conceptual cost <br /> estimate for the addition/renovation scheme and rendered new construction <br /> design estimate were deemed equitable in terms of cost comparison figures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.