Laserfiche WebLink
Fire Station.Building Committee <br /> minutes <br /> March 4, 1999 <br /> Present: Joyce Mason, George Baker,Dr. Elizabeth Petti, <br /> Peter Thomas, George Weznia , Joseph Peltier <br /> Guests: Deputy Fire Chief- Sheldon Hamblin <br /> Project Architects-Len Bertaux, James May <br /> Inspector of Buildings -William Hauck <br /> Meeting CaUd.to Q by Chairman Mason at 3:oo p.m. <br /> Town Hall, Conference Boon 4 I. <br /> W&dngaday.Febmaa24...1999= <br /> Motion made by Mr.Wezniak to approve the minutes o <br /> Wednesday,February 24, 1999 as presented. <br /> Motion seconded by Mr. Thomas. <br /> YDIE-.b Unanimous. 560, <br /> Mr. Peltier abstained. <br /> RUQRT--OF--TBE AR-CWIECL. <br /> Len Bertaux,Principal-in-Charge and.dames May,Project Architect <br /> of Wallace,Floyd, Associates presented conceptual design estimates <br /> for the Mas . ee Fire&Rescue Station project to members of the <br /> Fire Station Building Committee. <br /> Design schematics relative to the renovation of the existing station, and <br /> the construction of a new facility on the south side of the subject site <br /> location was discussed. <br /> It was noted that a fl I basement is incorporated into the design scheme <br /> of 2B.-new construction, in lieu of a}ire-engineered building. <br /> The construction scenarios were fully considered. The conceptual cost <br /> estimate for the addition/renovation scheme and rendered new construction <br /> design estimate were deemed equitable in terms of cost comparison figures. <br />