Laserfiche WebLink
Fire Station wilding Committee <br /> Minutes <br /> August 1 , 1999 <br /> Present: Joyce Mason, George Baker,Dr. Elizabeth Petti, <br /> George Wena ,Peter Thomas,Joseph Peltier <br /> Guests: James May—Project Architect <br /> Sheldon Hamblin—Deputy Fire Chief <br /> William Hauck—Inspector of Buildings <br /> Russell Wheeler—Assistant Inspector of Buildings <br /> Meeting Called to Order by Chairman Mason at 1.1-05 a.m. <br /> Town Hall, Conference Room*L <br /> MINUTES <br /> Thursday,JuIv 1 �999 <br /> Motion made by Mr.Baker to approve the minutes of Thursday, <br /> July 15, 1999 as presented. <br /> Motion seconded by Dr.Petti. <br /> VOTE: Unanimous. 6-0. <br /> APPROVAL OF PAYNffiNT REQUISITION: <br /> Motion made by lir.Peltier to approve the payment requisition o <br /> $8,37 . 0 to Wallace,Floyd,Associates,Inc. as presented. <br /> Motion seconded by Mr. Weniak. <br /> VOTE: Unanimous. -o. <br /> REPORT OF THE ARCHHTE,C `: <br /> annes May presented a revised summary description of design changes t <br /> reduce the construction cost of the 1ashee Fire&Rescue Station project <br /> to members of the Fire Station Building Committee for review and <br /> consideration. <br /> It was noted that a subcommittee net with the Architect last week to <br /> review potential construction reduction scen os. Additional savings <br /> consider an overall reduction of the addition and reuse of the present <br /> emergency generator. <br />