Laserfiche WebLink
llashpee Fire and Fescue Station <br /> Summary Description of Resign Changes to Reduce Construction Cost <br /> August 12,,1999 <br /> Savings Made as of August 12,1999 <br /> Site Work/Site Utilities <br /> Front Parking area reduced in size. <br /> Eliminate replacement of existing parking wearing course,seal only <br /> Reduce quantity of parking at gear of building. <br /> Building <br /> Basement area reduced to eliminate need to shore against the existing apparatus bay foundation <br /> Reduction in number of windows by 25% <br /> Eliminate concrete masonry unit wainscot at interior partitions <br /> Change epoxy finish in apparatus bags to sealed concrete <br /> Change toilet room flooring from ceramic file to vinyl file <br /> Change wood baseboard to vinyl <br /> Change majority of first floor ceilings from shcetrock to acoustical ceiling grid <br /> Reduce quantity of cabinets in kitchen <br /> Reduce quantity of shelving mi vehicle maintenance areas <br /> Plumbing <br /> Reuse existing air corepressor <br /> Electrical <br /> Reduce emergency generator from 100kw to 25 kw <br /> Delete security system <br /> Additional Savings Made as of August 12,1999 <br /> Basement floor area reduction from 4,650 SF to 2,785 SF <br /> First floor area reduction from 4,650 SF to 3,810 SF <br /> Second floor area reduction from 3,975 SF to 3,706 SF <br /> Total floor area reduction 2,974 <br /> i <br /> Reuse existing emergency Generator <br /> Potential Additional Areas of Savings <br /> Eliminate Furniture Budget($30,000) <br /> Paving by Town($14,175) <br /> Site Clearing($2,500) <br /> Reseeding((3,500) <br /> WARWARC HITECWASHPEEI07w o TIDD_ HN -DOC 08/18/99 <br />