My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/25/2000 FIRE STATION BUILDING COMMITTEE Minutes
>
02/25/2000 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:04:42 PM
Creation date
4/27/2018 2:22:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station Building Committee <br /> Minutes <br /> February 25, 2000 <br /> 'resent: Joyce Mason, George Baker,Dr. Elizabeth Ptti, Peter Thomas <br /> Absent: George taenial , Joseph Peltier <br /> Guests: John Marshall— Standen Construction Company <br /> Steve Borucki—Standen Construction Company <br /> Len Bertaux—Wallace Floyd Design Group- <br /> Mark Pitt ley—Wallace Floyd Design Croup <br /> Sheldon Hamblin—Deputy Fire Chief <br /> William Hauck-- Inspector of Buildings <br /> Diane Rommelmeyer--Town Accountant <br /> Meeting convened: 9:00 a.m. <br /> Town Hall, Conference a Room 42. <br /> Pre-Construction Meeting: <br /> The Fire Station Building Committee net with project representatives for the <br /> purpose of reviewing preliminary issues relative to the Mashpee Fire &Rescue- <br /> Station project. <br /> 1. Notice to Proceed Status: <br /> The Wallace Floyd Design Croup shall file with the Inspector of <br /> Buildings, final documents relative to Construction Control, the 780 CNR <br /> Narrative and Blue Prints for permitting purposes. The conformed set of <br /> plans and specifications including addenda#1 and#2 shall serve as the <br /> official set of documents for construction. <br /> A cost estimate will be obtained from New England Reprographics in the <br /> Town of Yarmouth for the necessary copies warranted for the project <br /> proposal. In addition to the general distribution process, each filed <br /> subcontractor is entitled to two sets of drawings- <br />
The URL can be used to link to this page
Your browser does not support the video tag.