Laserfiche WebLink
Fire station Building Committee <br /> Minutes <br /> November 9, 2000 <br /> PROJECT OVERVIEW: <br /> Site visit—OSHA: An inspector from OSHA was on site today and <br /> detected a number ofconstruction violations. 'The neral contractor and <br /> his filed subcontractors are expected to immediately address this matter. <br /> As per OSHA regulations, the general contractor must meet standards to <br /> maintain a clean and safe job site. The Clerk of the works was directed t <br /> photograph all.detected violations that have been rectified and report <br /> directly to OSHA. <br /> Review and AMroval of Fele hone/Cora uter Svstem Installation: <br /> Three bids were considered for the installation of all wiring components <br /> associated with the telephone and computer system installation, warranty <br /> and service. In addition to Cape wide Telephone, bias from SBC <br /> Telecommuni <br />