r , <br /> Fire Station Building Committee <br /> Minutes <br /> November 301, 2000 <br /> Change order Review: <br /> Change order# 27 - $781.60: <br /> Installation ofmesh, second floor slab. <br /> vFDG recommends approval. <br /> The change order approval was deferred at this time. <br /> Change Order# o - $35025.26. <br /> Install wall hung P-2 future type units instead ofsink units. <br /> W'DG recommends approval. <br /> It was noted that the sink frxtures were incorrectly specified. <br /> The change order approval was deferred at this time. <br /> Ron 1 lerlo, the Project Manager placed the Committee on notice stating <br /> that all plumbing orders would he placed on hold as a result of the sink <br /> issue, and that the general contractor would not•proceed unless the sink <br /> change order has been approved. The Committee voiced concern with <br /> respect to the tone of the memorandum. <br /> Change order# - $75447.54: <br /> Conduit for site electrical. <br /> VVTDG recommends approval. <br /> What was considered before this was less than standard? <br /> Further clarification to be obtained. <br /> Change Order#107-P - 351.27: <br /> Modification to mechanical ductwork and addition of wall louvers. <br /> F"DG recommends to reject/resubmit. <br /> The natter was deferred at this time. <br /> Approval of Construction ChanRe Directive for Roof Franin ; <br /> It was noted that the Committee voted to approve and execute the <br /> Construction Change Directive for the Roof Framing for a sura not to <br /> exceed $10,000 on November 20, 2000. To,date, the general contractor <br /> has not submitted an exact figure for the roof change request. <br /> • <br />