My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/30/2000 FIRE STATION BUILDING COMMITTEE Minutes
>
11/30/2000 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:14:11 PM
Creation date
4/27/2018 2:44:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/30/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r , <br /> Fire Station Building Committee <br /> Minutes <br /> November 301, 2000 <br /> Change order Review: <br /> Change order# 27 - $781.60: <br /> Installation ofmesh, second floor slab. <br /> vFDG recommends approval. <br /> The change order approval was deferred at this time. <br /> Change Order# o - $35025.26. <br /> Install wall hung P-2 future type units instead ofsink units. <br /> W'DG recommends approval. <br /> It was noted that the sink frxtures were incorrectly specified. <br /> The change order approval was deferred at this time. <br /> Ron 1 lerlo, the Project Manager placed the Committee on notice stating <br /> that all plumbing orders would he placed on hold as a result of the sink <br /> issue, and that the general contractor would not•proceed unless the sink <br /> change order has been approved. The Committee voiced concern with <br /> respect to the tone of the memorandum. <br /> Change order# - $75447.54: <br /> Conduit for site electrical. <br /> VVTDG recommends approval. <br /> What was considered before this was less than standard? <br /> Further clarification to be obtained. <br /> Change Order#107-P - 351.27: <br /> Modification to mechanical ductwork and addition of wall louvers. <br /> F"DG recommends to reject/resubmit. <br /> The natter was deferred at this time. <br /> Approval of Construction ChanRe Directive for Roof Franin ; <br /> It was noted that the Committee voted to approve and execute the <br /> Construction Change Directive for the Roof Framing for a sura not to <br /> exceed $10,000 on November 20, 2000. To,date, the general contractor <br /> has not submitted an exact figure for the roof change request. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.