My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/9/2001 BOARD OF LIBRARY TRUSTEES Minutes
>
10/9/2001 BOARD OF LIBRARY TRUSTEES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 5:09:55 PM
Creation date
5/1/2018 11:34:33 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF LIBRARY TRUSTEES
Meeting Document Type
Minutes
Meeting Date
10/09/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+W <br /> Library Tj'6US1:e es <br /> 10/9/03, <br /> Page 2 <br /> III REPORTS: (Conti`.nued <br /> Wayne e laini'. t:4 �#t -he had rho,.,ie . some research on the building <br /> Committee and what .ii-s responsibilities were. He researched <br /> the Town Meet inq Reports., 'Ae found .to his. surprise that. the <br /> building committee Nvc.s set -up to ;AE,.e about expansion and ��- <br /> vation of'_ 'the current 1i' rary, not. t-c -tee ,u ild i t. He waS also <br /> sur- ri-sed to find t'-'-at. the feasibility study was being done -to <br /> de to rmi ne'- # t r they. needed to do re.n6vation, expansion, both,- <br /> build <br /> tai,- <br /> b ild a new library, Whatever i was ., The study was done by <br /> Powers and Company. To' this - day, ETarne ex l'ained that he had <br /> not- received the results of the feasi.bi.lt study. In the <br /> minds of all of the selectmen, they believed that what- was <br /> needed was a new - library, not a re ovation. We seemed to be at a <br /> standstill because of Powers & Cbmp-any who, they believed, over- <br /> did the scope o� the work. <br /> The fact of the natter is, she did not do what they had asked. <br /> to be done. on April 1 , . 2000 , they were supposed to receive <br /> r <br /> a feasibility study, completed and .into their ham s . Dere we <br /> are now, at 2001, and Wayne had not seem the results of the <br /> study. Now, where do we oxo? How do we procced? The '.fact of <br /> the matter is , the board of seleetr►en were the ones who were <br /> in control of the c n'tractual agreements for the Town, and were <br /> the - people who decided whether to sign contracts. or to do the <br /> things to move forward. <br /> There axe ' some issues that have be addressed, and that is , <br /> where do we go from here with the money?r' Wayne explained that- <br /> he . belieed there was $120 , 000 that was set aside for architec- <br /> tural design work. The fact of the -ratter i s, we do not have <br /> the results of the feasib.i liter study to go ahead ar�d do the <br /> architectural design. Tt seems that the architectural designs were <br /> put a little before we knew what was h6ppening. <br /> Mr.. Taylor explained further that David had met -with him be-ore <br /> a meeting with him and the Mashpee Commonse Unfortunately, we <br /> .have to go through thein for the design of the b i ldi ng. - That <br /> i , r�ovidin r the libr� ry remains at this location. We have to. <br /> work with that situation. There Were other sites which were <br /> addressed at the meeting that they ossib-ly. would - allowfor the <br /> library -use. There are advantages to that as well. 'there are <br /> advantages to be able to keep this building in operation while <br /> they build the new buildin . There is also some availability <br /> there ' for help in the architecture-1 -desiarn work. <br /> Vlhat will be the cost o that library Is it a library that <br /> the Town can afford without the grants of four ir.-i .li.on, or three <br /> million? The grant is a good feature, but if we cannot get it, <br /> we still have to be able to afford what we need. We have to be <br /> conscious of that. <br />
The URL can be used to link to this page
Your browser does not support the video tag.