Laserfiche WebLink
i <br /> • I <br /> i <br /> i <br /> Ilashpee Public Library <br /> P.O. Box 657 <br /> Mashpe , Ma 0264 <br /> Circulation for May 2007 was 9,996 iters. This month's circulation-was almost <br /> the sane number as last May's 9.992, Our year-to-date TD total of 123,1 <br /> iters exceeded last-years total by 61550. We are still about % ahead of the <br /> same point last year. In addition, our YTD total for downloadable audio books s is <br /> 132 items, Wh ife I have been pleased with the reception of this r_ ew r t <br /> some of the member Iibrarr s have expressed dissatisfaction with the vendors <br /> response to problems. Since several libraries opted Trot.to continue with this <br /> service, we will terminate the service as ofJuly-I . - We a had received a group <br /> subscription price from Recorded Books so it was not affordables a stand alone <br /> option. _A commiftee from CLAMS will be exploring other vendors and making. <br /> recommendations for new products to the membership. This service will be <br /> revisited later in,the new fiscal year. <br /> Marilyn Farren and 1 inter0ewed five candidates last week for the temporary <br /> summer circulation position at the librai y. We were pleased to have five good <br /> candidates to choose from and have recommended one choke to the oard. <br /> The toy candidate r1 -bpresented to the Board later i the -meeting for a vote <br /> on the recommendation.tion. The candidate has extensive. CLAMS experience and <br /> can step right into the position without training. The other candidates had <br /> interesting skills but didn't have the CLAMS circulation experience: The position <br /> is scheduled to begin on July 1 s . <br /> on May .31st, I attended a meeting at the Ashland Public Library for the libraries <br /> on the grant construction waiting list. David and Dianna joined me that the <br /> meeting. ,- Rob Maier, Director of the I I LC and some of - the Library <br /> Commissioners spoke about what they expect. to. happen over the net few <br /> months. • -I'm attaching a summary of the meeting that I prepared.following the <br /> meeting. <br /> I was very interested to tour the Ashland Public Library. The demographics, <br /> building sizes, and staffing were very similar to Il ashpee. -Viewing that library <br /> gage rye a good idea of what 22,'000 SF would look like. The meeting room was <br /> about the size we are planning iii the new library. and -the. -building ' eras , <br /> constructed on two levels. The young Adult area and Quiet Sturdy spaces were <br /> also features,vire have planned for the new library. <br /> i <br />