Laserfiche WebLink
Ilashpee Public Library <br /> P.O. Box 657 <br /> Mashpee, Ma 02649 <br /> Circulation'for October 2007 was 10,579 items. circulation YTD was 50,52 <br /> items Yearly transactions are still slightly behind 2006 (526 items less). I do <br /> think that reneging DVDs and VHS tapes has had a small negative impact on <br /> total circulation. We had abut 200 more'rene a s this month than in September <br /> 200 6. Renewing items a second week cut,,tfie frequency of visits and the <br /> opportunit to -take -additional items.- Transaction figures-willprobably-even out <br /> over they ear bort to date it has had the opposite effect I would have a p <br /> The t d. <br /> p � <br /> The patrons lure- beingable to renew so it has been received �sitivel <br /> - <br /> from their aspect. <br /> Catherine Laurent, Steve cook and I recently attended a workshop at SEMLS on <br /> Man L'n Your BLIding Pro act. The other participants were at various stages in <br /> their ' <br /> roects. Some were contemplating doing a project, some were doing <br /> p � <br /> feasibility studies and a fever were on the grant waiting list. We were the 'most <br /> advanced in our progress towards building a new library. We picked up a few <br /> tips in the morning but most of that session involved activities flashpee had <br /> already completed such as site selection and doing an RFP for an architect. We <br /> felt the afternoon session was most applicable to our project. It focused on <br /> selecting a project manager and working with the architect and contractor on final <br /> design -and construction. <br /> Cheryl Bryan, continuing Education Director for SEMLS, suggested that we visit <br /> the Lakeville Public Library since it was just a few riles do ern.the road. We took <br /> advantage of its proximity and were given a tour by the library director. She told <br /> us about some of the pluses and minuses (heating/cooling) of their project and <br /> vire could see examples of some of the sit a ions Ch-eryl has dis'pulsed in the <br /> workshop. <br /> Thea application period for Owner's Project [Manager closed on November , <br /> pp <br /> 2007. We received seven submissions for the s bcor ittee to -review at the <br /> November 14th meeting. our recommendation will.be forwarded to the Planning <br /> and Construction eommitt e,for their meeting on November 20th. <br /> have received the instruictions for the FY 2009 budget packet. Department <br /> Beads have been told to level fund the Expense.Iludget and to include only step <br /> - 4 <br /> increases in the Salary Line items. We are to include an -impact statement <br /> showing the effect of level funding on the departrne.nt. The Town continues with <br /> the hiring freeze and will not be.creating any new positions and will fiJl -only <br /> essential positions If someone leaves. Let us hope that ouir.current staff hays <br /> with us this year so vire don't have to find out if our positions are considered <br /> essential. The budget is due on November 21't.. - <br /> f - <br />