My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2000 LIBRARY BUILDING COMMITTEE Minutes
>
03/20/2000 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 5:04:24 PM
Creation date
5/1/2018 2:38:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/20/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Firm. <br /> Ms . Powers stated she would provide examples of how columns <br /> and foundations of an existing building can be reused in an <br /> attempt to contribute to the overall cost of the project . <br /> The plans for the existing building have been reviewed by <br /> Ms. Powers and they are currently being reviewed by the <br /> structural engineer. Ms . Powers spoke to construction materials <br /> including slabs, condition of insulation, position of windows, <br /> and ceiling heights. <br /> Ms. Powers had nothing further to report on potential <br /> opportunities for improved site use (Mashpee Commons shared <br /> parking, utilities, and curb drives) . <br /> A Cape Cod Commission review is not required for this <br /> project, as confirmed by the Town Planner. <br /> The matter of the possibility of an alternative site is in <br /> the process of being researched and will be addressed at a future <br /> meeting. <br /> Ms. Powers continued to present/discuss concept design by <br /> stating the edges of an atrium center/lobby should be intensified <br /> in order to provide as much public service aspects as possible. <br /> She also spoke to visibility aspects, filtered daylight, and <br /> interior landscape. <br /> Ms. Powers would like to begin by focusing on organization <br /> of the circulation desk area; she requested input from the <br /> Library Director so that she can prepare an in-progress <br /> presentation, the input from which would result in a final <br /> presentation. <br /> At this point of the Meeting Ms . Powers made references to <br /> the informational packet she provided focusing on two-drawings, <br /> the first of which was drawn free-hand, the second drawn to <br /> scale. <br /> Ms . Powers stated she has organized the existing columns and <br /> foundation dimensions . The more refined drawing shows people <br /> occupying the courtyard area (undecided if trees or grass will be <br /> planted here) . <br /> Bubble Diagrams-References were being made to the veranda <br /> area, surrounding the courtyard area, with access from the <br /> children' s and meeting areas. Ms. Powers reported she is <br /> simultaneously working on incorporating energy designs in this <br /> area, which would include a reading area, fans, lights, possible <br /> wicker furniture (a more casual atmosphere) . There is an airlock <br /> area which would require a door and lower ceilings in order to <br /> provide an informational area, which would lead to the <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.