Laserfiche WebLink
PV <br /> Libraries <br /> that have built or renovated /expanded older buildings' find circulation <br /> increases substantially <br /> ,after construction projects. I have examined three library <br /> building projects from similar sized .communities; Harwich, Ashland and Lakeville. <br /> Harwich's library was an expansion and renovation- completed in I*Y 1998. 1 have <br /> included Harwich in the chart even though it predates the -other construction <br /> projects by quite a bit because it is the only Cape com munity simiIar to Mash pee <br /> ; <br /> with a recently completed building. Like the others, it experienced increased <br /> usage after construction. Ashland and,Lal eville guilt new libraries in FY 2005. <br /> I've included. Harwich's statistics for. Y 2006 as a more up-to-date comparison to l <br /> the -other communities and to shove that the growth in usage continues to this <br /> day. In all cases, the libraries experienced a healthy percentage increase in <br /> circulation and holdings (collection size) in the year following construction. <br /> The chart shows the population size, hours open, total circulation, circulation by <br /> hours en number of re istered orro rers li brary card holders) and holdings <br /> (collection size . It's interesting to note that Mashpee's current circulations per <br /> hour (63.35) are greater Ahan Ashland's after their construction project. <br /> Mashiee's current circulation is comparable to Ashland and Lakeville even <br /> p <br /> though Mashpee's sta. istics are preconstruction.- <br /> Mashpee has always been a <br /> much busier library than its size would indicate. It ranks in the top ten CLAMS <br /> leaders in circulation each year. After the new building is completed,' Mashpee's <br /> circulation will be in the range of Harwich's circulation. I have included a -chart of <br /> CLAMS" libraries' circulation for �Y 2008. You can see that Mashpee is one .of <br /> the busier libraries although it is physically smaller than most of the other. <br /> libraries. The number of registered' borrowers increased at all the libraries, <br /> following construction, showing more people were using the new libraries. . <br /> circulation per hour increased as well, showing the need for additional staffing to <br /> provide service for the increased crowds. Falmouth's circulation for the first <br /> quarter of FY 2008 was 88}428 chile they were in temporary quarters). Their <br /> circulation for the same time period this year .1,36,100 now that the building <br /> roFedt is corp feted and they are back in the library. The difference is a 54% <br /> increase, similar to ghat Mashpee can expect. <br />