Laserfiche WebLink
Mashpee Public Library <br /> P 0 Box 657 <br /> Mashpee MA <br /> Circulation in February was 8,8$3 items, compared with last year's <br /> circulation of 8,475. In spite of the recent the cold snap. Y-T-D circulation <br /> i was 82,266, compared to 79,256 last year. This year exceeds last year's <br /> figures by 3,010 or 4°la. <br /> The building subcommittee last met on February 1e and reviewed the <br /> upcoming construction schedule. The final pieces of carpet were installed <br /> on March and 7t'. Touch up painting is on going. Phones will be <br /> installed March 17th. Computers are on order and will be installed later in <br /> March. We are finally down to the final details and punch list items. In <br /> reviewing what still is to be done, the March 1' date mentioned at the last <br /> meeting was overly optimistic. Moving at the end of March and reopening <br /> in mid April looks like the perfect time frame to coincide with completion <br /> of the final tasks. <br /> Bridget and Janet Burke have begun working on the logistics of the move. <br /> They made a site visit to the library to view the available shelving in each <br /> section. This will help determine where each section of the collection lives <br /> and how much space it will occupy. Janet had some reservations about <br /> the amount of shelving installed in the YA room. It was a bit skimpy for <br /> collection growth and there was no real display space in the room. She <br /> also didn't have enough hanging space for her media collection. A <br /> representative From Tucker shelving was doing installation at the time <br /> Janet was visiting the site. <br /> The Planning and Construction Committee agreed to extend the lease on <br /> the 3M conversion station by one month. It was slated to expire on March <br /> 8"'. We still have all of the stored collection items to enter. We are <br /> finishing up with the media items stili at Joy ST. The new library is <br /> undergoing a seven day flush out period which will end March 7th. Then <br /> we will be able to move the conversion station and have volunteers work <br /> on the stored items. <br />