Laserfiche WebLink
This readsheet is organized in twoparts; again by circulation volume Chart with the busiest <br /> libraries in the Was <br /> itions and their curfent. _FTE levels . The second part Xhart BI is organized by <br /> ranking current FTE from highest to lowest. The dne 110brary included in the spreadsheet that is not <br /> similar to Mashpee in size or transaction volume is Wellfleet. 1t has a year round population of 2,724, <br /> compared to Mashpee"s 14,227 year round population, yet It has a staffing level identical to Mashpee <br /> (5.9 FTE). That level ties Mashpee for the bottom of the staffing chart. 1lashpee's population is five <br /> times the size of Wellfleet and 44% more transactions.. yet Wellfl et spends $36..000 more per year on <br /> staffing; roughly equal to the Reference position we are requesting. Wellf#eet was included to show that <br /> Mashpee's staffing level is only appropriate for a much smaller community. <br /> i If the 2 FTE we are seeking are tdded to the staffing, Mashpee would have 7.9 FTFP still below four of <br /> the libraries on the spreadsheet (#1., #2., #4, and #10 in circulation volume). This staffing level would <br /> l Jnr u I rovi d e a n ro Hate leve 1 of st f n n e it h e r ove rl <br /> pine 11ashpee surely�n the rn�dd and o p g� <br /> generous nor totally inadequate (#7, , and #15 In circulation volume). The libraries remaining below <br /> M ash pee after the increase in staffing are ranked#5 an'd#11. At the current[eve 1,we are below the FTE <br /> of#S.We are not seeking to have the highest staffing level in CLAMS but merely to have a staff size that <br /> meets tine volume of business for a town of this size. <br /> EXPENSES <br /> i <br /> The library Expense budget was reduced to bare-bones in FY 2011. There was nothing left to cut this <br /> C <br /> year. I had zeroed out Line Items 5381 (Professional and Technical) , 5710 !n State Travel) and 5730 <br /> (Memberships and Dares) last year.These line items are zero funded again this year. <br /> We have been in the new library about sic months. The yearly cost of utilities is still unknown. I have <br /> used the same figures as FY 11 for Lire Items 1D(Library Energy)and-5340(Lotbrary Communication). <br /> I reduced Line Item 5580 (Library Supplies)to $500 last year. Since then, we have added a Swipe Card <br /> system to the l ibrary'�s networked printer/photocopier. I have added the cost of a supply of swipe cards <br /> i - <br /> ($700)to my Library Supplies Lite Item submissions.The explanation is included below. <br /> i <br /> library funded).The Friends of the <br /> The ► 1 Line 'Item paysfor Children's programs at the b ry <br /> Library and the Massachusetts Cultural Council both provide limited amounts of programming. <br /> i money to the library. I have eliminated town funding and will use.whatever programs we can <br /> afford from those sources. I zeroed out the 57 (Dues and membersh*ps) last year. lira <br /> item/Dues and Memberships. While these memberships are valuable and give us discounts on <br /> i <br /> workshops,they were sacrificed because of the difficult fiscal situation. <br /> i we have additional phone voice limes and a dedicated elevator line on Steeple ST. Line Item <br /> 5340 (Communication) is level funded as FY 2011. 1 won't have a true idea of what <br /> ommuni ations will cost until we cornplete a fu If year on Steeple St. <br />