Toni stated 95 for parking spaces meets the requirement but could be small for pickup trucks, <br /> which makes knowing the use important. They are figuring on maximum office space to base the <br /> number of parking spaces. They are short the 10' buffer requirement in some areas. Sheldon <br /> requires H20 load system, sprinklers, fire alarm systems, and a 1"-20' site plan to do ung <br /> radius template. Rich rewires controlled construction documentation and individual use and <br /> business types as they occupy. Glen requires the reserve area to be built out now using a fast <br /> system. There are limits on storage of hazardous materials. Cathefine requires a stormwater <br /> system plan and durnpster plus separate container for cardboard. Rodney suggested a locking <br /> mechanism on the dumpsters and an emergency contact list. Each new tenant will need approval <br /> from the building and health departments. They need to file with the Planning Board. Tom <br /> noted they would need to rrfeet standards for a laboratory or research facility. <br /> Duck fond Limited Partnership <br /> 106 Falmouth Road. <br /> Self storage building, contractor, storage and business incubator, light industrial, office, lab or <br /> reasearch space. <br /> Stu Bornstein, Arne ojala <br /> The site is the old Augat Building. They propose two -story buildings adding up to lo , 00sf. <br /> They are boo' back from the street. They will be fenced in with installed cameras, silent alarms, <br /> and gated entry. It will be used primarily for contractor and self storage. They are pursuing <br /> paper storage, offering dehumidified space, to municipals and attorneys. The operation Hours <br /> will be 7 a.m. to 7 p.m., and they anticipate low traffic use since trucks do pickups and deliveries. <br /> Sheldon requires a l"- 20' site plan and notations where existing hydrants are. Rich requires <br /> verification of each allowed use. The rnaximurn usea a needs to be detenrnined to allow for <br /> flexibility and all possibilities. Torn referred to existing parking changes recorm nded by the <br /> Planning Board, including reduction of the Augat paring area,. Design Review has requested <br /> more building detail. They plan to use green and beige blend on metal with a clapboard 'in front. <br /> They estimate 8,000sf for incubator space, 2 ,000sf contractor storage, and 20,000sf self storage <br /> g <br /> in each building. The incubator space ranges from 500 to 800sf for a useage time of 3-6 months. <br /> They expect average use to be ,00sf, but they want to be flexible onP artition . Sheldon wants <br /> to see a sprinkler system design for all contemplated uses, especially incubator space. Charlie <br /> stated that individual.tenants will need approval by the Building Department. Storage of <br /> combustibles will not be allowed. Motorcycles and cars must have their gas tanks drained. Glen <br /> expressed concern about inadequate number of bathrooms and the wastewater system needs to be <br /> designed for maximum possible use. Bornstein will provide the plans Glen requires. The septic <br /> system will be redone for maximum flow. The plan to ut.0 partitions in the incubators ace <br /> ' p p p p � <br /> as they find out what demand is. Then the galls will mostly stay put. They want to redesign the <br /> building for maximum potential uses. They are scheduled for Design Review on February 9 ' and <br /> Planning Board on February 15th. They will plan to return to Plan Review. <br /> The Minutes of December 2, 2005 were moved and accepted as presented. <br /> Meeting adjourned at 11:35 a.m. <br /> I1 elstho e l E ordin beret <br /> g aq <br /> 5 <br />