Laserfiche WebLink
May Institute <br /> 1 Falmouth Toad, Deer Crossing <br /> Building B Upper Level, Unit B24 <br /> Offices for vocational training, education <br /> Faye wingard, Lori Gimblett present <br /> Vere will be two workrooms and the remainder will be offices. Donnie asked the number of <br /> staff and students and the ratio. The use is B (Business), although I (Institutional)was <br /> questioned. Institutional includes o ernite stays. They need a door installation for emergency <br /> use in case of fire. The building space is l, osf. Sheldon requires a full station by the exit <br /> doors and an up-to-date alarm system. Richard would like to do a walk through with fire, health, <br /> and electrical expert. Tony Ferragamo did the first building, and Richard will phone him to <br /> obtain any records. The restroorns will need to be Handicapped accessible. <br /> McShane Construction Co. <br /> 340/342.Main Street <br /> Kenmark Office Systems/Warehouse/Mercantile/Storage <br /> Justin La orneux, rich Delaney, Kevin Kirrane present <br /> This is a commercial building designed strictly for Kenrnark with their own wastewater system <br /> in a C-2 district. It is"t" shaped for retail and storage use. Kenrn rk will occupy 6,000sf and <br /> the rest is cordo minirmi ed with exclusive use areas and a common drive. A de-nitrification <br /> unit is proposed. The flow will be 3 ogpd. There will be a separate distinct unit loaded for H20. <br /> Ronnie cited no floor drains allowed and limits n hazardous waste storage. The change of use <br /> will need to be authorized. Richard recommended second meax s of egress by adding door, <br /> The first floor is 5,000sf, and the second floor is divided as follows; I,00 sf, 2,000sf, and <br /> ,000sf with space for showroom and storage(copiers,paper, furniture,cartridges, equipment, <br /> etc.) They are business-to-business oriented rather than retail. Tom suggested they move. <br /> loading to the rear to preserve a"village'look. Their response: Truck loading requires this <br /> layout out front. Design Review is concerned with grading. They plan alternative grading and <br /> extensive planting. They will keep a 10'buffer with planting continuing around the front. They <br /> meet the setback from the bike path(ruin. 207max. 40)with 39'. They show septic leaching on <br /> the diagram. They also show where the second building might go. They are scheduled for <br /> Planning on May '. Sheldon requires 20' of road, aisles 24', and definition of fire lanes. The <br /> loading issue needs to be fine tuned. They need one handicapbathroom, unisex, and no public <br /> use is planned. Toni recommended installing a door in front to connect to the sidewalk for a <br /> more standard look. Richard would like to talk more in depth about the showroom and <br /> compliance with 52 1. Sheldon expressed concern about where the second building is being <br /> placed and the issues this brings up. <br /> Recommendation: To adept. <br /> Torn Fudala abstained as he will meet with the Planning Board. <br />