Laserfiche WebLink
i <br /> 4 <br /> Town Hai <br /> Roof Rubber membrane roof leaking. warranty may have been voided. <br /> Waiting for estimate from contractor. <br /> Shingle roof replaced in 1997 with renovation? <br /> Exterior Some rotting of window and door frames/sill s -replace. Power <br /> wash faade. Repoint brick. <br /> Septic System Cess pools` Check with Board of Health on condition and location <br /> (ire parking lot?). <br /> Par-king Lot overlaid in 1997 With renovation. Moderate cracking. Complete <br /> reconstruction with additional drainage in FY07 costs- $9510.00. <br /> Need cores. <br /> Building Systems HVAC replaced in 1997 with renovation. <br /> Generator Proposed in past. Priority? <br /> Archives <br /> Roof Some shingles replaced in 2004 because of wind damage. <br /> Exterior Reshingled <br /> Septic System ' Check with Board of Health. <br /> Parking Lot Major cracking. No drainage. <br /> Kids Klub <br /> Roof <br /> Exterior <br /> ���-- -- <br /> Septic iter ? - <br /> Parking Lot Major cracking and collapse. No drainage. Complete <br /> reconstruction with drainage in FY07 costs- $47 000. <br /> Police Department. lb , <br /> Generator Check with.Chief re: need for replacement. <br /> Roof ? <br /> Exterior ? <br /> Septic'System Sewer <br /> Parking Lot Moderate cracking. Need additional lighti g. <br /> 61411-Nle 4E IK 5 V4 4-w ry e f..,b 5 At LAee M e Ov t P, ? <br /> Fire Department <br /> Expanded and renovated in 2000/200 1. <br /> Senior Center <br /> New construction in 2003/2004 <br /> Library <br /> New building proposed. <br />