My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
4/4/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:10:01 PM
Creation date
5/9/2018 2:04:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/04/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. Mashpee Police Station C. A. Crowley Engineering, Inc. <br /> HVAC System Survey <br /> • Heat Pump Loop Control 1 —r <br /> Preventative Maintenance <br /> • Undefined 1 <br /> Approximately one half of the service calls were related to the console heat pump units, and they <br /> consisted mostly of relatively minor control problems that required replacing a Wed control <br /> component or adjusting and resetting of controls. one of the service calls related to the heat pump <br /> units resulted in the replacement of a compressor, and a second call required the replacement of the <br /> entire unit due to a failed compressor valve. <br /> The service calls related to the boiler consisted ofthe replacement of a therino-couple, replacement <br /> ofthe low water cutout,replacement oft thein-line circulator,and replacement ofthe make-up water <br /> valve. <br /> Six of the service cads were routine for preventative maintenance in the fall and spring at the start up <br /> of the.heating and cooling systems. <br /> One of the service calls was in response to a problem wi <br />
The URL can be used to link to this page
Your browser does not support the video tag.