My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
4/4/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:10:01 PM
Creation date
5/9/2018 2:04:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/04/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Iashpee Police station C. A. Crovvleyngineerig; Inc. <br /> HVAC System Survey <br /> Based on our review and assessment of the HVAC systems, we would not recommend making any <br /> major changes to the HVAC systems, or changing the type of systems that are presently in place. Our <br /> recommendations consist of either replacing or refurbishing aged or failed equipment with sirdar <br /> equipment;upgrading temperature control systems and replacing failed control system components; <br /> adding mechanical ventilation systems to provide outdoor air to all occupied areas of the building; <br /> implementing energy conservation measures;cleaning ductwork;and balancing air handling systems. <br /> The following is a summary of our recommendations with comments: <br /> I. Hot water Boiler;The boiler is approximately 27 years old and nearing the end of its normal useful <br /> life. As noted previously, the boiler appears to be 1n relatively good condition, vith no reported <br /> problems ith its condition or performance. Due to its history of satisfactory performance with <br /> minimal repairs,we would not place a high priority on the replacement of the boner at this time. <br /> We would however,recommend that the boiler be replaced in approximately 5 gears. At that time, <br /> the boiler should be replaced with a high efficiency boiler system consisting of two units or <br /> nodules that would provide the facility with a back-up heat source. <br /> 2. Evaportive Cooler: The evaporative cooler that serves the water source heat pump system <br /> is approximately 15 years old and in fair to good condition. The normal lifespan of an <br /> evaporative cooler is 20 years. The tower has received regular preventative mai <br />
The URL can be used to link to this page
Your browser does not support the video tag.