Laserfiche WebLink
TOWN OF MASHPEE <br /> PLANNING & CONSTRUCTION COMMITTEE <br /> 5 <br /> Minutes of the Meeting of Tuesday, August 15, Zoo <br /> committee Members Present: Members Absent: Also Present; <br /> Eu e�1e sarn � <br /> Joe Brait Catherine Laurent, DPI <br /> Irving Goldberg <br /> Devin shaken <br /> Stere Cook <br /> Janice Mills <br /> Sheldon Gilbert <br /> Tricia Parolski, Ex-Officio <br /> Chairman Eugene Smargon called the meeting to order at 7;00 PM. Sheldon Gilbert introduced <br /> himself'as a new member of the committee, and was relcomed-by Chairman Gare Srnarg on. <br /> REVIEW of MINUTES <br /> The committee unanimously approved as corrected the minutes from the meeting of 8101106. <br /> OLD BUSINESS <br /> #11. Review of Draft Request for Technical/Price Proposals: construction Project <br /> Manager consulting services for south Mashpee Fire � � <br /> p Substation Project <br /> Committee members had reviewed the draft prior to the meeting, and offered the following <br /> comments and suggestions for change. <br /> Global Comment Irving Goldberg noted that the travel expenses for those bidding <br /> onthe project are left open. Iry suggested that the anticipated travel of � bidders <br /> should <br /> be included in their quote. <br /> Page 1114.- <br /> Pa rag raph <br /> 114*Paragraph 'I, last sentence, the wisdom of inclusion of the Project Manager PM)$1753 000 tee <br /> and the accuracy of the number, were questioned. It was recommended that it be left out. <br /> Paragraph 2, first sentence, reference is made to specifications. It was questioned I� � stoned whether the <br /> specifications are in a separate document, or whether this draft is considered to include the <br /> specifications. <br /> Paragraph 2, last sentence, all Enquiries relative to the fire substation project should be directed to <br /> the Town Manager in writing, not to Fire Chief George Baker.- <br /> Page 21'1 <br /> The last paragraph, last sentence states that the" Project Manager shall be a person who i <br /> registered by the commonwealth as ars architect or professional engineer and who has at least <br /> years experience in construction and supervision of construction ...... . Yet on page 8114, last <br /> paragraph, it states the"PM shall have a minimum of 16 gears of construction ..." Catherine <br /> Laurent explained that the 5 years of experience refers to a statute minimum requirement. If the <br /> PM is not a registered architect or professional engineer, then a minimum of 7 gears of <br /> experience is required. Catherine suggested than perhaps the Town is requiring more years than <br /> the statute minimum requirement. <br /> Page 3114: <br /> Under#2-consultation during Project Development, in the fast sentence end the sentence <br /> ce <br /> after the words"provide a cost estimate". Delete the words owith comments on value engineering <br /> opportunities and constructabilit r problems"from the sentence, as these do not fall under the <br /> scope of,the Project Managers responsibilities. <br />