Laserfiche WebLink
Mash pee Fire Station No. <br /> Mashpee, Massachusetts <br /> Construction Meeting <br /> April Sot 2008 <br /> Present <br /> Joyce Mason UM)—Town Manager <br /> Rene Read (R ) —Assistant Town Manager <br /> George -Bake-r IGB) --Fire Chief <br /> Catherine Laurent(CL)— DPW <br /> Eugene Smargon (ES)---P&C <br /> Steve Cook(SO—Chairman P KC <br /> Ernie VirgiIio E l - lerk <br /> Rick Pomro r (RP)— Pornroy Associates(PA) <br /> Pete Berbato(PB)- Barbato Construction $Q <br /> Paul Martin.5(PMI- Borbaio Con.5truction JBC) <br /> Deborah Durlard {DD}— Durland Vann Voorhis Architects ( VV) <br /> Prog ress <br /> 1 Confinued trusses, framing slope, hurricane ties and gables. <br /> Schedule <br /> 1. EB will prepare a revised schedule at the end of May once the buliding is weather fight. <br /> . Confinue with framing, roof trusses, bracing and plywood. <br /> I. Mart trim next week, <br /> . Electrical MH tomorrow. <br /> .5. Schedule gas zervice installation. <br /> 6. Continue site grading of eastside. <br /> . Roofing to start after trim.Tentatively Monday, May 11 <br /> Old'Issues Action by Due <br /> . - Exterior door warranty is still an issue. DD sear BCC another DEB <br /> manufacturer. ( ) DD spoke with manufacturer and they are to Fax <br /> what they sent to Thompson. EB to loofa at credit to change side <br />