Laserfiche WebLink
Ma hpee Fire Station No.2 ` <br /> Construction Meefing Meeting #4. <br /> April 23, 2008 <br /> Page 2 <br /> doors to fiber loss. (5)ongoing <br /> 4.3 EB to prepare a list of outstanding shop submittals. ( )only <br /> insulation, doors and a handful of re-submittals outstanding <br /> 44 Credit request for deleted electrical work still outstanding. � ) still <br /> wailing <br /> 4.6 BCC b prepare a story pole. ( ) next.meeting after tarn an <br /> k <br /> New Issues <br /> 5.1 Insulation contractor expressed concern that the vapor barrier may DD/PB <br /> not be effective and there may-be a problem with condensation <br /> and related problems in the future. He.provided information on <br /> Polyurethane foam. <br /> .5.2 They will be working on Saturday to rake up for days lost to rain <br /> this week, EV will stop by. <br /> 3 <br /> 5.3 There is All concern about traffic at the street. BCC to add cones <br /> for more warning. <br /> 5,4 Tree/grading does not nead to be decided till the end when the <br /> trailers are removed. <br /> e <br /> Field Observations <br /> .1 One clean out in the apparatus slab sits too low. BCC to correct. BCC <br /> I have prepared these notes and information based on my understanding of the meeting. If any of the <br /> items above differ substantially from your recollection or I have ornitt d significant information, please <br /> bring those discrepancies to my attention'on or-before the next job meeting. <br /> The nextmeeting is s hedu(ed for April 23,200$ at 10:00 in the job trailer <br /> Respectfully submitted, <br /> Deborah Durland, RA <br /> ca: Barbato Construction Inc. <br /> .Building Comm i sioner,Joyce Ma son, Rene.Reed, Catherine Laurent, George Baler, Steve Cook, <br /> Garcia Galuska DeSous , Boston Building Consultants, PornroyAssociates, Ernie Virgilio <br />