Laserfiche WebLink
l <br /> I <br /> Mosh pee Fire tofIon:No. <br /> i Construdion Meeting ## <br /> April 23o 2008 <br /> Po.g e 2 <br /> 15 submifted. (4) Plan submitted to PA. DD requested to be copied. <br /> . Counter colors next,,meeting. No detail has been submitted. (4) D.D BCC <br /> color to.be selected today. <br /> 3. Exterior door warranty i still an issue. DD sent BCC another DD/EB <br /> -manufacturer. ( ) DD spode with manufa tureir and they are to fax <br /> �ihat they sent to Thompson. EB to k)ok at credit to change side <br /> doors to fiberglass. <br /> 3.9 Change order number 1 given to PM and then it is to be sera offer <br /> signature to RP �4)- P gave to_RR today for inclusion at next <br /> ele tboo-rd meeting. <br /> New Issues <br /> .1 Woter department to 1nspeat water connection to main. <br /> 4.2 BCC iore care a-credit tchange � # <br /> p p o tie concrete.io <br /> standard broom finish concrete. <br /> 4.3 EB to prepare a list of-outstanding sho ubr ittals, <br /> 4.4 Credit request for-deleted electrical work Mill outstanding. <br /> 465 PM'to review framing question at entry roof/colvrnns with Dan <br /> Plator when he is on site. <br /> 4.6 BCC to prepare a story pole. <br /> Field observations <br /> .1 One clean out in the apparatus slab sits too love. BCC to correct. BCC <br /> I have prepared these notes and inbrmation based on my un dersta ndling of-the meting. -if any of the <br /> items above differ substantially from your recollection or t-have omitted significant intimation, please <br /> bring those discrepancies to my attention an or.before the next lob meeting. <br /> The next meeling is scheduled for April 23,2008 at 10:00 in the 4ob trailer <br /> espec lly submitted, <br /> Deborah D r]Qnd, R <br /> cc: Bar ato Construction Inc. <br /> Building Commissioner,Joyce Marson, Rene Reed, Catherine Laurent, George Baker, Steve Cook, <br /> Garda Goluska DeSousa, Boston Building Consultants, Pommy Associates, Erie Virgilio <br />