Laserfiche WebLink
T4s s F- <br /> Ma tepee Fire Station No. <br /> Ma pee, Mossaehuselts <br /> Construction ung <br /> April 23, 2008' <br /> M <br /> Present <br /> Rove Read (RR) —Assistant Town Manager <br /> George Baler (GB)—Fire Chief <br /> Catherine Laurent JCQ— DPI <br /> Ernib Virgilio(EV- 1-Clerk <br /> Rick Pomroy(RP)R- Pornroy Associates SPA) <br /> Ed Barbato(EB)-Barbato Construction (BC) <br /> 'Paul Martins JPM) -Barboto Construction (BC) <br /> D bofdh Du land (DD) — Durlond Van Voorhis Architects (DVV) <br /> Progress <br /> I. B to or walls framed. <br /> . Truss installation storied. <br /> Wall ea.t to %. <br /> . Light-pole bases installed <br /> 5. Parking lot up-to T baser compacted and tested. <br /> Schedule <br /> l Overall about 4 1/2weed ahead of oreov t> 9 <br /> i' in s heck;e. - will,pre are o .revised schedule, M A- <br /> 2. Continue with frc rntr g, roof trusses, brocIing and plywood. <br /> . May connect water,Hain tomorrow de.pending on progress of woter project. <br /> . Continue site grading at easisEde.. <br /> Old Issues Action by Due <br /> `-EB re-ported that the storm water protection plan is in progress. (2) -B ASAP <br /> no inb.Needs to be dome ASAP J3) not done. RP indicated-that he <br /> would not approve progress payment for s1fe work unless the plan <br />