My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/6/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
5/6/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:12:32 PM
Creation date
5/9/2018 2:27:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/06/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M shpee Library - DD Estimate Review rid Modifications - Update Post 4130108 Meed <br /> iffr _ iiate SuF!45tal $5,5111248.01 <br /> DD timate Review Modification and Agreed.VE�Uptions <br /> Page Def. Description Savings Comments <br /> 18 21F Eliminate PV gray system at this time $150,000.00 review after rebates are calculated <br /> 1 409 Pull out hydrant from project $2,590.00 Review w/F <br /> 1 417 Storm drainage estimate revision. 30,000.00 Per GC; <br /> 1 _ 419 Eliminate MIP demo line item 7,000.00 Covered in building demo <br /> 1 140 Modify road and parking demo 81,140.00 Per GG D <br /> 1 137 Modify building demo 27,700.00 Per P <br /> 1 150 Eliminate allowance for curb removal 21110.00 In road and parking gerno <br /> 2 128 Use CC berm instead of concrete 3,600.00 Agreed <br /> _105 Use CC berm instead of concrete 16,000.00 Agreed <br /> 2 103 Use CC berm instead of concrete 948.00 Agreed <br /> 104 Reduce pavement cost to$30/sq yd 36,310.00 Agreed <br /> 2 162 Flag pole by owner 2,500.00 Agreed <br /> 2 164 Parking signage by owner 18,159.00 Agreed <br /> 3 341 Provide alternate light for SL3 fixture 3,200.00 Agreed <br /> 343 Provide alternate light for SL3 fixture 1,200.00 Agreed <br /> 5 27,29,26,38140 Provide alternate exterior wall finish in leu of stone 0.00 Hold at this time <br /> 47 Use alurninurn flashing in lean of copper 181655,0 Agreed <br /> 202 Eliminate roof access hatch 2,500.00 Agreed <br /> 36 Cut back on storefront by 90 square feet 0.00 Not approved <br /> 116 Eliminate glazed entrance to after hours wing 0.00 Not approved <br /> 117 Case H M door to outdoors area from'story hour, 0.00 Not approved <br /> 22 Reduce e interior glazed walls by 30% 14,574.00 Review interior finish schedule <br /> 10 19 Deduce ceramic wall tiles by 50% 0.00 bold at this time <br /> 10 1,2 Cut back on terrazzo floor the and add carpet 33,000.00 Agreed <br /> 10 10 Eliminate wood base and use vinyl base 0.00 Not approved <br /> 10 14,15,16 Eliminate GWB cloud ceilings. 0.00 Not approved <br /> 11 55 Deduce cost to a more realistic value. 7,500.00 Agreed <br /> 11 194 Reduce signage cost to more realistic 5,000.00 Agreed,confirmed with sign vendor. <br /> 1 1 Toilet Access Material by Owner,install by GC 3,810.00 Agreed <br /> I 1 L79180 Eliminate(1)DVD return and 1 book return. 0.00 .Hold at this time <br /> 12 186 Eliminate motorized projection screen 0.00 Agreed <br /> 13 191 Reduce quantity of window shades to south side only 16,000.00 Agreed <br /> 14 21 Eliminate cupola 50,000.00 Agreed,possible add alternate. <br /> 16 355 Standard urinal 0.00 No savings <br /> 16 373 Devise storm drainage estimate 8,400.00 Agreed <br /> Deed comments from GGD on all MEP's <br /> Current Total of Deductions $3919896.00 <br /> Devised Estimate Sub-Total $5,119,352.00 <br /> Devised Estimate <br /> Revised Estimate Sub-Total $51119,352.00 <br /> Plus General Conditions at 8.5% 435,144.92 <br /> Plus bond and Insurance at l.5% 83,317.45 <br /> Plus o&P at 5.0% 28100.72 <br /> Pius Design Contingency at 5.0% 295,985.25 <br /> Grand Total $612159690.35 <br /> Plus Escalation Estimate $248,62.7.61 <br /> (6 aper year to mid project/8 the <br /> Pomroy Associates-Mashpee Library DCS Estimate Comments-412910 <br />
The URL can be used to link to this page
Your browser does not support the video tag.