My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
6/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:15:18 PM
Creation date
5/9/2018 2:27:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/02/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashi2ee Fire ,. PCO/Chang.e-Order Log- = Throe 5/31/08 <br /> PCO issue DESCRIPTION Date Reason For Change Change <br /> Original Value f=inal Value Class <br /> The first door entering the Lobby has keyless entry.The <br /> 1 Addition of Keyless entry hardware at interior door of Lobby. 3!25108 second door going from the Lobby to the interior of the building $1,297.00 $1 297.00 Desi n This ai <br /> is not currently equipped with Keyless entry and it should be i g <br /> order for the system to work. <br /> 2 Addition of remote transmi tens and receivers for each ovarhead 3125108 This system addition will allow the drivers to open and close $965-00 This� <br /> door. the GVHD doers from the cabs of the units. Design <br /> } This conduit is required to service the additional call box which The <br /> 3 Add an additional conduit from the electrical room to the exterior 3128!08 B has requested be roughed in at this location.The call box been <br /> door of the Admin Entrance. would be used in the event of an emergency and someone $802.00 $802.00 Upgrade this w <br /> goes to the facility and it is not open at the tune, prone <br /> The cu <br /> The re-design would include a sided galvanized angle box pitche <br /> frame which would frame the recess.The recess would be dry <br /> Fie-design of the arab at the overhead doors to accommodaterecrnr <br /> 4 112"elevation difference between the exterior concrete apron � �/p exterior o#the overhead door and would prevent wind driven ,�74. 0 ��4.�� Upgrade There r <br /> rain from entering the building from under the door. 8D made pg <br /> and the interior apparatus bay slab. this suggestion as they have employed this detail on other a prc <br /> projects and reportedly works very well. appfia <br /> linea <br /> the <br /> Net Change For C0#1 $5,238.00 <br /> The <br /> The team is concerned with the continuity of the vapor barrier applici <br /> Upgrade the attic insulation of the administration wing from Ba 11410 when using the Batt type of installation. Breaches in the gape $ 00.0 0 000 rade in ulal <br /> type to spray foam. barrier could result in moisture and mold issues in the future. . p9 Valu <br /> The spray foam application eliminates the concern_ deE <br /> analy r: <br /> The contractor hes recommended this change because of the The coy <br /> B Charge the specified aluminum gutters to copper. 5114108 possibility of color variations in the specified material which $900.00 $000.00 Upgrade <br /> would be eliminated with copper units. recom <br /> .... -The v <br /> The Pella system wood match the Windows and Moors.The looking <br /> Provide a Pella entrance system at the main entrance and contractor was not able to obtain woods doors with a Value but mut <br /> 7 fiberglass door systems at the 2)side door entrances of the 5114108 reasonable guarantee and the Team was concerned with -$4,100.00 -$4tOOO.00 Engineering proble <br /> apparatus bar in lieu of the custom wood doors specified. maintaining the doors_The proposed systems would be `rneering wood c <br /> maintenance free. team m <br /> P recommended this change for proactive reasons and to This cl <br /> 8 Change rain barrel pads from concrete to stone. 5114108 $0.00 $0.00 !Upgrade- pv sibili <br /> eliminate standing water at the rain barrels. <br /> Modify the emergency aerator ad size from 4x to x 1'141 8 Necessary to accommodate the approved generator. Size <br /> f g g p shown on drawins was genedc but not large enough. $400.00 $400.00 Design <br /> 10 Increase admin able end studs from 2x4 to 2x8 b114/0 Necessary to accommodate the insulation application, $40.00 $40.00 Design <br /> 11 Add on 314"plywqodGap to the chimney cap. 511410 Necessary for backin of the copper flashing. $40.001 $40.0 Desi n <br /> Pornroy Associates-Most Recent Report 8/212008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.