My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
6/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:15:18 PM
Creation date
5/9/2018 2:27:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/02/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashi2ee Fire - PCO/Change Order L - Through 5/31/08 <br /> Pio# ---- ----- <br /> [3EFIF''1"ll <br /> Issue Reason dor range have <br /> Bate tri nal Value Final Value gas <br /> 12 Modify the flashing interface detail between the exterior slabs at 5!14108 PA recommended this change for proactive reasons and to <br /> entrance and patio and the interior floor slab. avoid the transfer of water from the a tedor to interior. 00.00 $300.00 Upgrade <br /> 13 Eliminate the stamped concrete pari finish at the exterior patio 4129!08 Value engineering action. _ Value <br /> and provide a standard broom finish. 1,660.00 -$1'560'00 rin <br /> �n inee <br /> 1 Eliminate several electrical conduits which were not necessary 413 108 Value engineering action which resulted......from the on site IJnee <br /> fog the system. coordination meeting -$250.00 $250.00 alue <br /> En lneerin <br /> Net Change For CO#2 -$11130.00 <br /> Current Net Chancie Of 's 11108.00 <br /> Pomroy Associates-Most Recent ent f eport 612/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.