Laserfiche WebLink
Mas Fire - PCO/Chan-ge Order Log - Through 6130/08 <br /> FE <br /> - DESCRIPTIONIu� Reason dor Change harp Mass <br /> [date Original Value Final Value <br /> IE: <br /> The first door entering the Lobby has keyless entry.The <br /> Addition of keyless entry hardware at interior door of Lobby. 1 3/25108 second door going from the Lobby to the interior of the building .I,297.00 $1,297.00 Design This <br /> is not currently equipped with keyless entry and it should be in <br /> order for the system to work. <br /> 2 Addition of remote transmitters and receivers for each overhead 3125108 This system addition will allow the drivers to open and close $985.00 $985.00 Design Thi' <br /> door. the GVHD doors from the cabs of the units. <br /> This conduit is required to service the additional call box which Thbee <br /> Add ars additional conduit from the electrical room to the exterior 3!28108 B has requested be roughed in at this location.The call box � .� X802.00 Degrade this <br /> door of the Admin Entrance. would be used in the event of an emergency and someone pro, <br /> goes to the facility and it is not open at the time. <br /> The <br /> The re-design would include a(3)sided galvanized angle box pitcl <br /> Fie-design of the slab at the overhead doors to accommodate a frame which would frame the recess.The recess would be recoi <br /> 4 1121"elevation difference between the exterior concrete apron 3131I08 exterior of the overhead door and would prevent wind driven <br /> rain from entering the building ficin under the door, BCC made2,14.OD ,17 .00 Upgrade Ther <br /> and the interior apparatus bay slab. this suggestion ars they have employed this detail on other a l <br /> appl <br /> projects and reportedly works very well. <br /> linea <br /> Net Change For C0#1 $5,238.00 <br /> 5 Eliminate the stamped concrete pad finish at the exterior patio X129108 Value engineering action, _$1,5 .Oo - 1,580.00 Value <br /> and provide a standard broom finish. Ery ineerin <br /> Eliminate several electrical conduits which were not necessary !3010 00 Value engineering action which resulted from the on site Value <br /> for the system. coordination meeting. -X250' Engineering <br /> T <br /> The team is concerned with the continuity of the vapor barrier app <br /> 7a Upgrade the attic insulation of the administration wing from Batt 5114108 when using the Batt type of installation. Breaches in the vapor $3,100.00 $3,000.00 Upgrade in t <br /> type to spray foam. barrier could result in moisture and mold issues in the future. V <br /> The spray foam application eliminates the concern. I <br /> anal, <br /> The contractor has recommended this change because of the The <br /> 7b Change the specified aluminum gutters to copper. 5114108 possibility of color variations in the specified material which $900.00 $900.00 Upgrade <br /> rec <br /> would be eliminated with copper units. <br /> Tr <br /> The Pella system wood match the windows and doors.The look <br /> Provide a Pella entrance system at the main entrance and contractor was not able to obtain woods doors with a Value but <br /> c fiberglass door systems at the(2)side door entrances of the 5114103 reasonable guarantee and the Team was concerned with -$4,100.00 -$4,000.00 prc <br /> apparatus bay in lieu of the custom wood doors specified. maintaining the doors.The proposed systems would be Engineering wog <br /> maintenance free. tears <br /> Tin i <br /> d Change rain barrel pads ficin concrete to stone. 11410 ��+recommended this change for proactive reasons and to .�� �.�� Upgrade posy <br /> eliminate standing avatar t the rain barrels, <br /> Pore y Associates-Most Recent nt Report 71712003 <br />