My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
7/7/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:25:32 PM
Creation date
5/9/2018 2:28:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/07/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Fire - PCO/Change Order Loci = Through 6130108 <br /> I <br /> DESCRIPTION issue Feasor For Change Change Class <br /> Daae 11 11 Original Value Final Value <br /> 7e Modify the emergency generator ped sire from 4x to �c1 5/14/08 necessary to accommodate the approved generator. ie 0�.Oo ��.�� Design <br /> shown on drawings was generic but not large enough. <br /> 7f Increase admin qable-end Muds from 2x4 to 2x6 5/14108 Necessary to accommodate the insulation a lication. $40.00 $40.00 Design/Upgrade <br /> 7g Add on 314"plywood cap to the chimney cap. 5114108 PA recommended this change as a proactive waterproofing $40.00 $40.0 Design/Upgrade <br /> measure. <br /> Modify the flashing interface detail between the exterior slabs at 5/14/08 PA recommended this charge for proactive reasons and to 00.00 $300.00 Upgrade <br /> entrance and atio and the interior floor slab. avoid the transfer of water from the exterior to interior. <br /> Net Change For CO#2 41,130.00 <br /> Cost associated with moving 1 apparatus bay unit heater to 5128108 This is a cosmetic recommendation and will not improve or $920.60 $921,00 Upgrade <br /> avoid seeing the exhaust stack in the front elevation. effect the operation of the system. <br /> Net Charge For D $920.60 <br /> Current Net Chang _ #CO's 1 �5028.60 <br /> Pomroy Associates i Most Recent Report 71712000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.