Laserfiche WebLink
M shpce Planning and Construction Committee <br /> Minutes of Meeting Held Monday, August 4,2008 <br /> Mecti ng Room 2 . <br /> Committee Members Present: Steve Cook, Irving Goldberg, Joe Brait, Kevin Shacke t, Eugene <br /> Smargon, and Janice Mills. <br /> Absent: Sheldon Gilbert and Tricia Parolski(Ex Officio Member). <br /> Also Present: Catherine Laurent, DPW <br /> Rich Pomroy, Pomroy Associates <br /> Chairman Steve Cook called the meeting to order at 6;30 p.m. <br /> Approval of Minutes <br /> Janice Trills motioned to accept the minutes of the Meeting of July 7, 2008; Irving Goldberg seconded the <br /> motion; and the notion was approved, with Eugene Smargon abstaining. <br /> Fire Substation# <br /> Rich Pomroy provided an update to the Committee as detailed in the attached project update meeting of <br /> August 4, 2008 document, along with the Change of Order Log and July 31, 2008 Development.budget <br /> update. These three documents are attached to the printed set of these minutes. Rick said he believes <br /> they will meet the completion deadline by the end of this month. <br /> Exhaust Recover stun,..They have 2 bids: one for 1 x,000 and one for 1 o . Criteria in <br /> specification was that equipment had to match exactly with existing equipment at main Fire Station. The <br /> low bidder was not the same manufacturer that provided main station equipment so Rick Pomroy and <br /> Chief Baker visited a system completed in Fall River and with minor deviations equipment was identical. <br /> Owner of low-bid company use to work for the company that manufactured the old system. Rick's <br /> opinion is that there is no reason not to accept the low bidder. With their bid they did not provide their <br /> financial information. They provided 2005 and 2006 data;they are certified for aggregate over <br /> Million in business so Rick doesn't sec any problem. The State Attorney General's office said providing <br /> the financial information is not a legal re wire nt, more of a local requirement and municipality has <br /> jurisdiction to waive or request the information. Rick will be sending his review comments to Rene'. <br /> water line...Iick Pomroy advised that this is done and over with. 1t was completely tested. Gene <br /> Smargon asked is there still a sludge problem? Rick responded that the water Department takes <br /> responsibility for that. It is believed that the problem occurred in existing main that wasn't being used. <br /> Andy said he is going to be putting a discharge line on that line and run it constantly. <br /> PCO/Change Order Lo ...Items 1� K,and l l on page 2 of the attached Change Order Log describes <br /> adding a bollard; credit for eliminating curbing: and eliminating domestic water backflow. In reviewing <br /> these, both Gene and Janice suggested that maybe we need more than one bollard. Rick said he will take <br /> another look to see whether more than one needed. <br /> Motion: Joe Brait motioned to accept Change Order#4; Janice Mills seconded the motion; and it <br /> was unanimously approved. <br />