My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:17:45 PM
Creation date
5/9/2018 2:28:49 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/02/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ICO,#' DESCRIPTION IPTIO Issue <br /> Date Reason For Change <br /> Modify the emergency generator pad size from 9 to 6x1 X17Necessaryacc r rrroda Ori final Value Final Value Change Class <br /> to to the approved generator.Size <br /> 7f Increase adrr�rn able errd studs from 4 to frown on drawirf s was eneric but net lar a nou ��,00 <br /> 'f 8 I feces to accommodate the insulation �. $400.00 Design <br /> Add on 3I '"plywood cep to the ohirx�r�e cap. PA recommended this a �ication. $40.00. <br /> �f X41 8 a change a a proactive waterproofing 40.�o Desr n/U rade <br /> Eh Modify the flashing interface detail between the exterior slabs at measure. $40.00 $40.0 <br /> entrance and atro arrd the interior Hoof slab. P recommended this change for proactive reasons a Design/Upgrade <br /> 6114!08 and to <br /> avoid the transfer of crater from the exterior to interior. $300.00. $300.0 <br /> Upgrade <br /> 8 Dost associated-vvith moving(1)apparatus bay unit heater to Net Change For C # _$11130.00 <br /> avoid seen tl a exhaust stack in the front elevation. This is a cosmetic recommendation and will not ire rove or <br /> 6128108 p <br /> effect theaeration eratlon of the stem. $920.60 $921.00 Upgrade <br /> l�9 <br /> Net Change For D#3 $920.60 <br /> 9 Cost associated with adding(1) "bollard to protect HVA Proactive change to <br /> X123108 g prevent apprtu from backing into the <br /> 1 pad mounted HVA unit at the rear of the building, $0.00 17.00 Installij <br /> Credit for the elimination of curbing. n1 <br /> 1318 Praactire than a for drair�a a and snow foie in <br /> 11 FCredit far the elimination of the domestic water backflow measures. <br /> rev nt r. 1 10 -$67.00 Upgrade <br /> eccomend ti n by the J1IMashp e Water Department <br /> - - ,11 .00 Value <br /> Net Change For C0#4 -$1,18Engineering <br /> 4. 0 <br /> Current Net Char« a Of CO's 1 2 &4. 844. 0 = <br /> .3%of General Contract <br /> POmroy Associates-Most Recent Report 9/212008 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.