My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/2/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:17:45 PM
Creation date
5/9/2018 2:28:49 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/02/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Masi Fire PCO/Chancie Order <br /> ## DESCRIPTION Issue <br /> Date � Reason For Chane Chane Class <br /> Original valueFinal Value <br /> The first door entering the Lobby has I eyless entry.The I I I . <br /> 11 <br /> Addition of keyless entry hardware at interior deer of Lobby. 3125/08 second door going from the Lobby to the interior of the building <br /> i not currently equipped with keyless entry and it should be in �l' x.00 1, .0Design This <br /> ac <br /> order for the system to work. <br /> Addition of remote transmitters and receivers for each overhead Thisrstem addition will allow the drivers <br /> door. 3125108 to open and close This <br /> the VHD doors from.the cabs of the units. $966.00 $965.00 Design <br /> This conduit i required to service the additional call box which The <br /> 3 Add air additional conduit#rorr�the electrical room to the exterior B has requested b roughed in at this 16/0 g s location.The call box been i <br /> door of the Admin entrance, would be used in the evert of an emer enc and $802.00 $802.00 Upgrade this ur <br /> g someone 19 s ( <br /> gees to the facility and it is not open at the time. proce� <br /> The cui <br /> The re-design would include a )sided galvanized angle box pitchec <br /> Re-design of the slab at the overhead doors to accommodate a frame which would frame the recess.The recess would be dra <br /> 112"elevation difference between the exterior concrete apron 3131108 exterior of the overhead door and would prevent wind driven recornrr <br /> and the interior apparatus bar slab. rain from entering the building from under the door. BCC made 2'174.00 $2,174.00 Upgrade There a <br /> this suggestion as they have employed this detail on other a prol <br /> projects and reportedly works very well. applicai <br /> lineal fo <br /> r <br /> 5 Eliminate the stamped concrete ped finish at the exterior patio Net Charge For C4 926, <br /> aril provide a standard broom finish. 12glo8 Value engineering action. _$1,560.00 -$1,560.00 Value <br /> Eliminate several electrical conduits which were not necessaryEngineering <br /> X10106 Value engineering action which resulted from the on site Value <br /> for the stern. coordination meeting. -$250.00 -$250.00 <br /> Engineering <br /> The team is concerned with the continuity of the vapor barrier The a <br /> 7a Upgrade the attic insulation of the administration wing from Kett when using the Batt type of irrstellatl applical <br /> type to spray foam. 5/14/08 P on. Breaches in the vapor 3,1 o�.DO inulatii <br /> barrier could result in moisture and mold issues in the future. !000.00 Upgrade <br /> The spray foam application eliminates the concern. aloe <br /> deli+ <br /> anelzec <br /> 7bThe contractor has recommended this change because of the The coni <br /> Change the specified aluminum gutters to copper. 6!14108 possibility of color variations in theeclfi <br /> p ed material which 00.00 $90.00 Upgrade <br /> would be eliminated with copper units. recomrr <br /> The Pella system wood match the windows and doors.The The we <br /> Provide a Pella entrance system at the main entrance and contractor was not able to obtainlooking c <br /> 7c fiberglass door systems at the side door entrances of the /1l08 reasonable uarartee an woods doors with a bort rr�ucl <br /> g d the Team was concerned with -$4,100.00 - 4,000.00 Value <br /> apparatus bay in lieu of the custom wood doors specified. maintaining the doors.The proposed systems would be Engineering problem <br /> maintenance free. <br /> good do <br /> team moi <br /> d Change rain barrel pads from concrete to stone. 5!14108 PA recommended this change for proactive reasons and to This chi <br /> eliminate standing water at the rain barrels. 0.00 X0.00 Upgrade possibility <br /> Pomroy Associates-Most Recent Deport 9/2/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.