My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:24:48 PM
Creation date
5/9/2018 2:30:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
x ViI[age Place 1448 Turnpike Street,5 u1te 2.-1 1 South Easton,AAA 023751 T 508/238-50401 E 508/238-5042 <br /> associatesWWW. OMrD a.SSOEiate .com <br /> Mashpee Libraly ProLectdae <br /> Meetigg Aen da " <br /> October 28, 2008, 6: opm <br /> 'own #ieials Present <br /> Joyce Mason [ 1,Ren6 Read[ ],Catherine Laurent[ �,Helene DFue[ <br /> Committee Members Present <br /> Steve Cook,Chairman [ ],Iry Goldberg,Mice Chairman [ ,Janice Mills,Clerk[ ], <br /> Joe Prait[ 1,Sheldon Gilbert[ ],Tricia P rolsl i [ ],Kevin Shackett[ ],Eugene Smargon[ �. <br /> Manazement Team Present <br /> Richard Pomr y [] <br /> gen ds <br /> 1. Public LibraLr <br /> o Bid Results -- Attached please find the tabulation ofGC bid results. After the bid openings the <br /> onun.ittee.voted to accept Alternates 1 (Cupola) and 2 (wood Trellis) and not go forward with <br /> Alternate Limestone in leau of manufactured cast stone units). The lowest bidder'with Alternates 1 � <br /> and 2 is Bufftree Building Company, Inc out of New Bedford, MA with a bid price (including Alts 1 <br /> and 2) of $6,402,800.00. The bid percentage spread between the first bidders was $49,200.00 or <br /> less than 1.00%. This is a very low percentage spread and reflective on the quality of the documents. <br /> o Bid Form Review and DCAM Checks — PA. reviewed the GC and Filed-Sub bid form and DCAM <br /> checks and all gids are acceptable. (See Attached Report) <br /> o deference Cheeks — Reference checks were performed on the GC and selected'Filed-Subs. (See <br /> Attached Report) <br /> o HVAC Bid protest --- Discussion on D.D.S. Industries and Superior Sheet Metal. Protest is being <br /> heard at the AG's office on 10/30/08. Counsel recommends proceeding with low Filed-Sub at this <br /> time. Impact of protest could increase GC contract by $75,060.00. <br /> o Comrfflttee to Vote to Award—Appropriate to vote to award the contract to Bu tree. <br /> o Presentation to Selectman and Notice to Proceed — Should occur at the Nov' P Selectman' <br /> Meeting. <br /> o Material Testing Bids—Presentation of results and recommendation of award. Vote appropriate. <br /> o LEER] Certification—HD, SC and RP attended the LEER Grant workshop on 10/16/08. Discussion. <br /> o Second 0% Payment by MBLC—will occur after the contract is signed and building permit issued. <br /> o Project Budget — The project budget has been adjusted to reflect the GC bid amounts including the <br /> Alternates 1 and 2. Over the nett month the budget will be adjusted in areas required and a final <br /> budget breakdown will be presented to the Committee. Given the recent bids, assumed adjustments <br /> and further information regarding IT and F,F&E we expect to see a Contingency of approximately 10 <br /> to 12% of the GC contract value. <br /> o Construction Schedule — The Team (JSR, Bufftree and PA will be conducting a Pre-Construction <br /> Meeting this Thursday and more information will be available after this meeting. <br /> o Project Invoices—Presentation <br /> Open Discussion <br /> P rnroy Associates—Project Update-Library— 10128108 Meeting Agenda Page t of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.