My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:24:48 PM
Creation date
5/9/2018 2:30:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
it[age Place 1448 Turnpike Street.Suite -]1 South Easton.MA o 1 T 508/238-50 01 F 5 08123 8-5042 <br /> 0 <br /> associateswww.pomroyassociates.com <br /> Masi Libre Proiect <br /> - Bid Report <br /> October 2 ,2005 <br /> Current Status <br /> 1. Biddin .Results—Attached please find the tabulation of GC bid results. After the bid openings the Cornrnittee <br /> voted to accept Alternates 1 (Cupola) and 2 (Wood Trellis) and not go for-ward with Alternate 3 (Limestone in <br /> leau of manufactured cast stone units). The lowest bidder with Alternates I and 2 is Bufftree Building Company, <br /> Inc out of New Bedford, IIIA with a bid price (including Alts I and 2) of$6,402,800.00. The bid percentage <br /> spread-between the first bidders was$49,200.00 or less than 1.00°x. This is a very low percentage spread and <br /> reflective on the quality of the documents. <br /> . bidder Bid Form and DCAM Checks—PA performed a thorough review ofthe bid forms and DCAM files for <br /> the folilowidg low bidders. General Contractor,Masonry}Waterproofing, lumbing,Fire Protection,HVAC and <br /> Electrical.PA did not perform DCAM file reviews for Mise Ketals,Roofing and Flashing,Tile,Acoustical Tile, <br /> Resilient Flooring,Painting and Elevators. <br /> -GC <br /> apmre ,-- AM fie was reviewed and appears to very good. Avg rating�- . The <br /> bid form appears to be complete and in order,However It should be noted that; <br /> 1. Buff ree had a clerical error on its bid form in the sense that they haat recorded the Plumbing <br /> - Filed-Sub and price in the Fire Protection line of the bid form and the Fire Protection Filed-Sub <br /> and price in the Plumbing ae. The error does not change the bid price. I have reviewed this <br /> issue with Brian O onnell at the AC's office{Bid protest Division)and he has agreed that the <br /> clerical error is aterial and can be accepted.f have also requested and received a letter from <br /> - Bufftree stating that the error does not affect their bid prig.And; <br /> 2. - The bid price Buffiree inserted for.Add Alternate#1 was less than the accumulative total of the <br /> effected Filed-Sub Bidders bid prices for the same Add Alternate #I.Add Alternate#1 included <br /> work to be performed by the GC,Roofer and Painter. The bid Prices which were submitted by <br /> the Filed-Sub Roofer and Painter which Buffiree carved totaled $16,500.00. The total prig <br /> which Buffiree bid for this alternate was $13,600.00 which is less. PA was contacted by the <br /> i second lowest bidder (Groom) and Groom claianed that the procedure was against the law and <br /> Bufftree's Alternate ##I prig must be at least the total of the Field-Sub Bids. I reviewed this <br /> matter with Brian O'Donnell at the AG"s office(Bid protest Division).Brian has researched the <br /> issue and has determined that Buff ree's bid is valid and the GC can quote any amount for the <br /> alternate*but is obligated to contract with the Filed-Sub for the Filed-Subs bid amount including <br /> Filed-Sub's hid alternate amount. Bruit has also provided evidence of a Superior Court finding <br /> substantiating this decision.I have attached this decision for your information. <br /> Masonry exnande - Bid forms appear to be complete and in order. DCAM-file was reviewed and <br /> appears to be fume Avg IAII rating—90. <br /> Waterproofing and Sealants P. J. Spillane}—Bid forms appear to be complete and in order.DCAM file <br /> was reviewed amd appears to be fine Avg DCAM rating—91 <br /> • Roomsg (Capeway Roofing) -Bid forms appear to be complete and in order. I I I file was reviewed <br /> and appears to be average.Avg ICAM rating—87. <br /> Plumbing Aram - Bid forms appear-to be complete and in order. DCAM file was reviewed and <br /> appears to be very good.Avg IAI rating T 96. <br /> ip Fire Protection {duras) -Bid forms appear to be complete and in order. DCAM file was reviewed and <br /> appears to be fine.Avg DCAM rating—93. . <br /> ' mroy Associates—Mashpee Library—10120/08 Project Bid update Page I of <br />
The URL can be used to link to this page
Your browser does not support the video tag.