My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
10/28/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:24:48 PM
Creation date
5/9/2018 2:30:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• HVAC (D.D.S. Industries)—Bid forms appear to be complete and in order. DCAM file was reviewed <br /> and appears to be very good. Arg DCAM rating—96. It should be noted that we have received a znoti e <br /> of intent to protest the low bid by the second lowest bidder (Superior Sheet Fetal) under the grounds <br /> that D.D.S.'s DCAM certification is not valid due to a licensing requirement. Town Counsel has <br /> reviewed this natter and bas advised us to proceed with the award to the GC with D.D.S. as the HVAC <br /> Filed-Sub Bid at this dime.The spread between the low bid and second bid is$75,060.00. <br /> Electrical rite Lite)..- Bid fonns appear to be complete and in-order. DCAM file was reviewed and <br /> appears to be average.Avg IAM rating—91. <br /> . Bidder Reference Checks — PA perf'onned a reference check for the following low bidders. GCDeral <br /> Contractor,Plumbing,Fire Protection,HVAC and Flenical.PA.did not perform reference checks for Masonry, <br /> Waterproofing and Roofing. The reference checks were establisbed from a random selection of DCAM projects. <br /> The goal was to gain a x n um of 3 favorable references. <br /> • Bufftr —Four references were called and PA ieceived excellent recommendation from all . <br /> (4)the references called. <br /> • <br /> Plumbing Arauio - Three references were called and vire have not heard back from any of the <br /> references at this bine. <br /> Fire Protection Cintas —Three 3 references were called. we have received good references <br /> from 2 and have not heardbaek from the 3dat this time. <br /> • HVAC.,,(D.D.S.) -•- ree 3 references were called and DDS has received good references from all <br /> three. <br /> • Electrical (Brite Lite) - Four references were called and PA good references from all of the <br /> references called. of particular note is that 1 reference called indicated that Brite Lite isy very difficult <br /> if not unreasonable with project changes and change orders. <br /> . what Are Our Next S <br /> s <br /> • G Bid Form Issues -- PA recommends that Town Counsel review our comments- above to'be sure that <br /> Counsel agrees with our comments as it relates to Buf free. <br /> D.D.S. Industries.Bid protest—Town Counsel has recommend proceeding with D.D.S. as the low Filed-Sub <br /> Bidder for HVAC. <br /> • GC Notice of Award and Contract—Pending confirmation with Town Counsel,PA would recommend that <br /> the Committee vote to award the GC contract to Bu ftree Building Company, Inc and send out a Notice of <br /> Award as soon as possible.Bufftr a will be responsible for deliveriug the GC Count for signature. <br /> Pre-Pre-Construction Meeting—PA would recommend that PA and JSR conduct a meeting with Buffiree as <br /> soon as possible to iron out all of the project procedures,protocol, etc.We will wait for lashpee's approval <br /> to do so. t <br /> ?Omroy Associates Nfashpce Library—10120/08Project-Bid UTpd-ate Page 2 of <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.