My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
12/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:27:08 PM
Creation date
5/9/2018 2:31:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/04/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> ._,,ifr..�•.lr .. . ..r r, ..5. _..: _.._._.. .. r- ..., r.., .� _r.„___._....,..--._ _. .,..-, - ._....,.,.. ., -...v.._,._.,..a ........_..,.,_ ..-. ._ ..rte ... _....,_ .-�....r.__ ..... -...__...___.. ____.a.._., <br /> Village lace !1}8 Turnpike quite -1 South Easton, A 02375 T 508/238- o!}o F 5o8/238-5042 <br /> rr! . f i 1if•l <br /> 5r yi.' <br /> omr <br /> ��Y-� <br /> associates <br /> .pa m roya s soc 1 a tes.c om <br /> i <br /> December I, Zoo <br /> Ms. Joyce M. Mason, Town Manager <br /> Town of Mashpee <br /> 16 Great Neck Road <br /> -Mashpee, NIA 02645 <br /> ,:fie: South Ma hp e Fire Substation—Pomroy Services <br /> 4 <br /> i <br /> Dear Joyce— <br /> We at Pomroy Associates have found ourselves in a position where we believe that we ' <br /> have provided the Town of Mashpee services far in excess of .t ae original contract <br /> agreement and f would life the opportunity to review these additional services with both <br /> you and the Planning and Construction Committee. <br /> i <br /> As a professional., I find myself to be extremely loyal to, our clients and to a fault I ver <br /> rarely say "eve dont own that"or "that will be an extra". We do what we think is best at <br /> the time to keep the prof ect moving forward with the hopes that it all evens out in the <br /> end. The problem we are having with the Fixe station Project is that there was never an <br /> evened out and when I look back; f realize that the extras just kept mounting up from one <br /> - to the next. <br /> I would like to ,ta.ke a moment and describe some of the areas where I believe we <br /> provided services beyond our negotiated services agreement; <br /> 1. Project Duration—The original project duration in our contract spanned 12 to I <br /> months. The final l prof et duration spanned 18 months thru the end ofSeptember <br /> Zoo . Several-items effected this, duration; -I the design was not completed as <br /> quickly as originally projected, mostly as a result of re-design and, value <br /> engineering to deliver the project .in line with the appropriation, 2 the start o <br /> oxnstruction was delayed for 3 months to avoid the added costs for winter <br /> rote tion, slower winter productivityand n extended construction duration, and <br /> 3)p <br /> the contractor completed the project almost 30 clays beyond the contracted <br /> date, <br /> While the scope of our work did not necessarily change during the increased <br /> project span, time is money and there was additional cost associated with <br /> managing the project for a longe-length of time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.