My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
1/28/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:05:00 PM
Creation date
5/9/2018 2:33:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a t � <br /> Village Place 1448 Turnpike Street,Suite 2-11 uth Easton,MA 02 375 1 T 508/238-5040 1 F 508 8-504 <br /> associates www.pomroyassociates.com <br /> Mashizee i r�ar lect <br /> LEEDConsultant Cost Summary <br /> January 22,2009 <br /> LEER Consultant Costs See scopes and breakdowns ns attached <br /> 0 .l Stewart Roberts $62,200.00 <br /> 91 Porroy Associates —20,1255.00 <br /> Total $82!0455.00 <br /> Historical LEES] Costs for Projects—The anticipated cost increase one could expect to recognize in <br /> a project going to a LEED Certified building varies significantly depending on who you talk to. We <br /> have attempted to research this as best as possible,but in our opi <br />
The URL can be used to link to this page
Your browser does not support the video tag.