My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/24/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
2/24/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:07:16 PM
Creation date
5/9/2018 2:33:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Planning and Construction Committee <br /> Minutes ofMeeting Held Tuesday,February ,2009 <br /> Meeting Room 1 <br /> Committee Members Present: Steve Cook,Irving Goldberg,Kevin Shackett,Eugene Smargon, <br /> Sheldon Gilbert,Janice Mills, Joe Brait, and Tticia Par lski x Officio Member) <br /> Also Present: Catherine Laurent,DPW <br /> Rick Pornry,Pomroy Associates <br /> Joyce Mason,Town Manager <br /> Helene le 'oe,Library Director <br /> Nancy Soderberg—Back-up Liaison,Library Trustees <br /> Audience: Brian Ihrl—.Mashpee Enterprise <br /> Chairman Steve Cook called the meeting to order at 6:33 p.m. <br /> Approval ofMinutes <br /> Irving Goldberg motioned to accept the minutes of the Meeting of January 28, 2009; Sheldon Gilbert <br /> seconded the motion;and the motion was passed,with Janice Mills,Joe Brait and Tricia Paarolski <br /> abstaining. <br /> UbMaTrqject <br /> Rick Pommy provided a written update on the.Library project and went through each item in detailed <br /> fashion. A copy of the written update is attached to the printed set of these minutes. Some of Rick" <br /> commentary and discussion with the Committee included the following: <br /> 0 Rick noted that because of winter weather they are going slower than usual, but are still on <br /> schedule. <br /> • Backfill started this week and hope to be complete the first week of March. <br /> Architect will do sample exterior color panel. <br /> A catalog of sample furniture designs for the new library was passed around to the Committee. <br /> When the time arrives to look at actual furniture to be considered,thea this Committee will be <br /> involved also'. <br /> 0 lick Pomroy to meet with Douglas Storrs on March 13'h and hopefully everything will be <br /> approved at that time. <br /> • L R ...Steve Cook mentioned that the LEER categories arc: certified,; silver;gold;and <br /> platinum. Rick Pomroy said if we achieve gold then we would achieve the third highest category. <br /> IMLPL CP...Rick advised that Patience Jackson 1s pleased with our progress. <br /> Budget...Rick said he will not give budget report on a monthly basis,but will be reporting <br /> contingency numbers. <br /> Rick advised that Helene LeFoe has been doing some research on.book security systems. They <br /> have a tentative meeting scheduled with 3M. He said they will need to install infrastructure <br /> beneath the slabs so he needs to get that work in before they pour the slabs. <br /> Proiect Chaucs <br /> Rick presented 2 Project Changes for approval by the Committee: <br /> Project Change fl...Electrical Primary--$23,588. <br /> Motion: Irving Goldberg motioned to accept Project Change##1 for$23,588; Sheldon filbert <br /> seconded this motion; and it was unanimously Passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.