Laserfiche WebLink
Pomroy Associates - Additional Time Spent Coordinating MCLP 2/1/08 t ru 4/24/09 <br /> Date Mashipee Commonso r in tion Function/Description Hours <br /> 10/21/08 issuance of revised curb line doc to M LP. 0.5 <br /> 10/27/08 Discussions with D5 re; exhaust vent, and outstanding issues. 3 <br /> 10/28/08 Elec primary clarifications with FT 1 <br /> 10/28/08 Review of M LP's design comments and exhaust gent. Resubmission of gent design to DS. 4 <br /> 10/28/08 Draft Design Approval request letter for JM. Review{quite Claim deed. 4 <br /> 10/29/08 Submission of Mashpee design request letter to M LP 0.25 <br /> 11/17/08 N TAR coordination with M LP 1 <br /> 12/10/08 NTAR coordination with MLP 2 <br /> 12/16/08 Site Mtg with TF 2 <br /> 12/15/08 Prepare primary sketch for coordination purposes and distribute. 3 <br /> 1/2/09 Electrical primary sketches hes and pricing work with TF 1 <br /> 1/14/09 Sidewalk lamp information and coordination with FT 1 <br /> 1/28/09 Electrical primary pricing negotiations 2 <br /> 1/28/09 Electrical primary discussions and pricing with TF <br /> 1/30/09 Easement and street work coordination mtg with DS and TF 2.5 <br /> 2/1/09 Summary memo and sketches re mtg above 2.5 <br /> 2/2/09 Follow-up comments with DS and TF 1 <br /> 2/6/09 Sidewalk lamp information wr TF 9.25 <br /> 2/10/99 Final pricing negotiations and submission to TF -2 <br /> 2/20/09 more discussions and negotiations with M LP re; primary 2 <br /> 2/24/09 M LP with curbing pricing 0.25 <br /> 3/3/09 MCLP with curbing pricing 0.25 <br /> 3/13/09 Mtg w/DS to review exterior color samples and discuss site coordination 1 <br /> 3/13/09 Follow-up memo 1 <br /> 3/18/09 Communication clarifications TF 0.5 <br /> 3/19/09 Communication clarifications TF 0.5 <br /> 4/9/09 Yet more with TF' 2 <br /> 4/13/09 Last review of easements and comments to CL 1. <br /> 4/15/09 Update memo to DS re street work start. 0.5 <br /> 4/15/09 More conversations with TF re; coordination 0.5 <br /> 4/21/09 Review o MCLP's engineers specs and sketches. 2 <br /> 4/22/09 Mtg w/TF and M LP engineer to review sewer tie-in. 1 <br /> 4/23/09 Final coordination with TF re; electrical primary and transformer pad location. 1 <br /> Total Recordable Hours X36 <br /> Page 2 of <br />