L16 <br /> Mashpee Planning and Construction Committee <br /> Minutes of Meeting Held'Thursday,August 6,2009 <br /> Meeting doom 3 <br /> Committee Members Present: Steve Cook,Irving Goldberg, Janice Mills,Eugene Smargon,and Joe <br /> Brait. <br /> Absent: Sheldon Gilbert,and Tricia Parol ski Officio Member). <br /> Also Present: Catherine Laurent, fw <br /> Rick ornroy,Pomroy Associates <br /> Helene DeFoel,Library Director <br /> Jane Dolan—Liaison,Library Trustees <br /> Audience: Mr. L .J.Ellis <br /> Mr.Michael Kelley <br /> Chairman Steve Cook called the meeting to order at 6:30 p.m. <br /> Approval of Minutes <br /> Janice Mills motioned to accept the minutes of the Meeting of July 2,2009;Irving Goldberg seconded the <br /> motion; and the motion was passed,with Eugene S argon and Joe Trait abstaining. <br /> Library Project <br /> Rick Pomroy provided a written update on the Library project and each item was discussed in detail. <br /> copy of the written update is attached to the printed set of these minutes. fglights of portions of the <br /> discussion include the following: <br /> • Rick said he is excited that the transformer is coning. 4 <br /> • Rick pointed out that August is going to be a very busy month. Being able to sheetroek on <br /> September l is a good sign since that shows we will be a month behind schedule and.now <br /> Buf r e will be able to provide a make-up schedule. Rick said he is confident we can get the <br /> project back on schedule and lufree will give a rough schedule and critical path schedule. <br /> • Rick explained that at this stage,he needs undivided attention of the project team and Rick <br /> therefore recommended to the Planning and Construction Committee that we either forego <br /> Subcommittee monthly meeti gs or reschedule for a different time or on an as-needed bads. <br /> Rick emphasized.that the Subcommittee is always more than welcome to Borne to the site,but at <br /> this stage the contractor has to be really focused on the construction. There was a lengthy <br /> discussion back and forth with suggestions of having architect come to meeting earlier than ten <br /> o'clock; changing time of construction meeting; or changing Subcommittee meeting schedule. It <br /> was finally agreed to change the Subcommittee meeting time to 9 a.m. for their August o"' <br /> meeting and to meet on an as-needed basis. <br /> a Mashpee Commons will be doing the installation of the curbing after Labor Day. On the sketch <br /> provided by Rick and attached to the printed set of these minutes,Rick pointed out that the <br /> parking space designated"open'will be terpoarily left open for NStar to get in and out but once <br /> the transformer is delivered then curbing will go in and the space designated as a parking space. <br /> 0 Even though Mashpee Commons doing the curbing,Rick asked Emerald Excavation to do the <br /> layout for the curbing and to Monitor the curb installation to ensure it is going'in at the right <br /> elevations. Rick said it will probably take 2 Emerald Excavation staff working one-half a day <br /> each for this assignment. <br />