My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/3/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/3/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:18:38 PM
Creation date
5/9/2018 2:36:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/03/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AUshpee Planning and Construction Committee <br /> Minutes of Meeting Heid Thursday,September 3,2009 <br /> Meeting Room <br /> Committee Member's Present: Steve Cook,Irving Goldberg,,Sheldon Gilbert,and Janice Mills. <br /> Absent: Tricia Parolski x Officio Member),Eugene Smargon, and Joe Brait. <br /> Also Present* Catherine Laurent,DPW <br /> Rick Pornroy,Pornroy Associates <br /> Helene Defoe,Library Director <br /> Nancy Soderberg—Back-up Liaison,Library Trustees <br /> Chairman Steve Cook called the meeting to order at 635 p.m.and announced that Mr.D.J.Ellis <br /> submitted a letter of interest to join this Committee. Steve said if Mr.Ellis comes to tonight's meeting <br /> then the Committee can have a discussion with him and answer any questions Mr.Ellis may have about <br /> function of this group. <br /> ApDroval of Minutes <br /> Janice Mills motioned to accept the minutes of the Meeting of August 6,2009;Irving Goldberg seconded <br /> the emotion; and the motion was passed,with Sheldon Gilbert abstaining. <br /> Fire Substation# <br /> Rick Pomroy reported that he and Brad Tripp did an inspection of Fire Substation#2 on Noonday because <br /> the one-yeas warranty period will expire raid-September. Rick sent out a punch list to the contractor and <br /> to the architect:. lick said there is nothing major and the construction engineer will look at the crack in <br /> the floor. Rick said Pete Barbado will be addressing all his issues and will get back to Rick. Rick <br /> advised the building looked very good; it was a positive inspection. <br /> Helene raised the question: On construction when does the orae-year warranty date begin...Rick said the <br /> one-year warranty runs from the substantial completion date. <br /> Library Pr-o_iet <br /> Rick Pomroy provided a Witten update on the Library project and each item was discussed at length, <br /> copy of the written update is attached to the printed set of these minutes. Some additional points made <br /> during the discussion were the following: <br /> Rick said the entry and vestibule doors will also be clone this month. <br /> In discussing timing for move into the new library building,the consensus reached by the <br /> Subcommittee was to let Buffiree finish completion and punch list and then start moving into the <br /> building when Buftree is out. ` <br /> Dick said we should have a good idea where they are insofar as schedule is concerned by.end of <br /> September. <br />
The URL can be used to link to this page
Your browser does not support the video tag.