Viiia e Place 1448 Turnpike Street,Suite 2--11 South Easton,MA o 23 75 1 T 5 -5040 1 F 50$/2-38-5042 <br /> o n 0.. <br /> + <br /> associates 5 www.pomrayassodateS.EOM <br /> aee Library Project Update <br /> Meegffg Ag - <br /> Sept tuber 3,2009 :30pm <br /> 'own Qf icials Present <br /> Joyce Mason [ ],Rend Real ] Catherine Laurent ] Helene DeFoe ] <br /> Committee Members Present <br /> Steve Cool,Chairman [ ],Iry Goldberg,vice Chairman [ ],Janice Mills,Cleric [ ] <br /> Joe Brait[ ], Sheldon Gilbert ],Tricia Parolski i ],Kevin Shackett Eugene Smargon [ ]. <br /> Manazement Teamreser <br /> Richard Pmroy ] <br /> A,aenda <br /> 1. August 09 Activities -- Sub-committee meetings were held on 816 and 8/20. Material submittals are now <br /> complete for the entire project. Progress for the month consisted of; the masonry is now approximately % <br /> complete; the electrical transformer,primaries and secondary's have been installed; air barrier 100% complete; <br /> roof panels and edge blocking complete; all windows have been installed; mechanical, electrical,plumbing and <br /> fire protection rough-ins complete and inspected; the interior walls have been frarned and the soffits are under <br /> way; the interior hollow metal door frames have been installed; all exterior plywood sheathing has been <br /> installed and the fascia trim is under way; the cupola was delivered and a test fit was performed; and all <br /> interior fire stopping was completed. <br /> 2.. Projected September 09 Activities — A sub-committee meetings are scheduled for 3 and 8/20. Fire <br /> Department walk-throughs were completed on 9/1 and 9/2; interior drywall will be completed; the cupola will <br /> be installed; exterior trim roof shingles and flashing; exterior caulking and shingles; elevator installation; site <br /> work will regain momentum; and Cape Cod alarm will complete the pre-wiring. <br /> . Construction Schedule—Bufftree provided a revised construction schedule at today's meeting. They feel that <br /> they will have'no problem meeting the January 8, 2010 Substantial Completion deadline. The building should <br /> thea be 100% complete with all punch list and turnover items by February 1, 20 10. r <br /> 4. Johnson Roberts—Status with design changes on project, meeting with Town Counsel, discussion. <br /> . Project Changes — See attached PCO/CO PCO/COreport. Presentation of recommended items for CO #4. Discussion <br /> n new and open PC 's. <br /> . Boob Management System—The 3M contract has been issued and PA is coordinating with 3M at this point. <br /> 7. LLL —The USGC response has Borne bat to our application. JR presented an update to the Sub-Comm on <br /> 813.Discussion on results and any actions. <br /> . M LP Coordination —MCLP will install its curbing and Steeple Street work starting sometime after Labor <br /> Day. MCLP has prepared the transformer area and NSTAR transformer has been installed. <br /> . Library Phone System—Update <br /> 10. Furniture Design—Update <br /> 11. M PL P — Monthly reports are being submitted timely and no issues to report. Next payment request will <br /> cone at %completion which should be at the end of October 2009.leo other issues to report. <br /> Pomroy Associates—Project Update-Library—9/3/09 Update Meeting Agenda Page 1 of <br />