Laserfiche WebLink
Mashpee Public Libras Project Chanq- e Analvsis - Design Adds <br /> Change <br /> ## DESCRIPTION Value Typo of Direct Project Order Ratio of Change Order Premium <br /> Change Pass-through Premium <br /> Amount Amourwt <br /> E1 Structural Steel Modifications 11,904.00 Design 3,332.80 3,671.20 30% <br /> PCO6 Asphalt Shingles,Revision 10,902.00 Design 7,631.40 3,270.60 0% <br /> PC08 HVAC Revision 1,180.00 Design 326.00 364.00 30% <br /> PC011 PV Mounting 12,224.00 Design 9,779.20 2,444.3Q 0% <br /> PCO12 Deer Hardware Revisions 6,367.00 Design 3,756.90 1,610.10 30% <br /> E6 CAD design time incurred b l llAC sub. 3,031.00 Design 0.00 3,081.00 100% <br /> PCO 14 Provide backflow preventer for boilers. 2,63&07 Design 1,346.65 791.42 0% <br /> E15 Lower openings at 2nd floor windows 2,274.00 Design 0.00 2,274.00 100% <br /> PCO 16 Door 111 Access Control 1,700.00 Design 1,190.00 10.00 30% <br /> PGO 17.PV Inverter Disconnects 1,763.00 Desion 1,261.60 536.40 30% <br /> $53,058.07 34,614.55 8.443.52 <br /> Mas Public Libre - Project Change Analysis - Design-Credits <br /> DESCRIPTION Value Type of Column noir Initiated by Change Status <br /> Change Used Designer <br /> PC03 Elevator Vent Modifications -1,080.00 Design -1,030.00 Approved <br /> PC07 Window Treatment Revisions -700.00. Design -700.00 Estimate,waiting for cost prqpqsal. <br /> PCO9 Elevator Electrical Revisions -955.00 Design -955.00 Approved <br /> -$2,735.00 - 3a. 0 <br /> The Net Design Change Premium at This Time is $15,708.52 or approximatl .2%of the Proiect Budget of$8,790,754.00 <br /> Dates; <br /> 1 P 's 11 and 17 involve the PV system which was a late add to the Project and obviously not 100%coordinated.The(2)PLO's total$13,224.09+1-.JFt's total fee for <br /> the implernnen ation of the PV system was$10,000.00. <br /> Pornroy Associates-Most Recent Report -11-09 <br />